View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant |
As Per TDS |
As Per TDS |
| PCC--.-- | The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook. Within first 60 days supplier must deliver 50% of the total deliverable of the contract products and rest 50% of the total deliverable of the contract products shall be delivered with in rest 38 days. If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract. If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG. For receiving Art Card and Printing Paper from NCTB, the Tenderer must have to submit 80% of the Value ( Bank Guarantee) of receiving Art Card and Printing Paper from NCTB. If the Tenderer does not use NCTB Supplied Art Card and Printing Paper, Tenderer’s Submitted Bank Guarantee shall be forfeited. If the Tenderer successfully supplied 100% textbooks according to Contract and receive 80% Bill then NCTB will return the Bank Guarantee (for Submitted Paper or Art Card) after 28 days of delivery of the textbooks. N.B: Other Terms and Conditions remain same with 01-161 Tender as Stated APP for 2022 Academic Year. Content Paper (80 GSM/60 GSM) and Art Card (230 GSM) will be provided by the NCTB. |
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook. Within first 60 days supplier must deliver 50% of the total deliverable of the contract products and rest 50% of the total deliverable of the contract products shall be delivered with in rest 38 days. If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract. If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG. For receiving Art Card and Printing Paper from NCTB, the Tenderer must have to submit 80% of the Value ( Bank Guarantee) of receiving Art Card and Printing Paper from NCTB. If the Tenderer does not use NCTB Supplied Art Card and Printing Paper, Tenderer’s Submitted Bank Guarantee shall be forfeited. If the Tenderer successfully supplied 100% textbooks according to Contract and receive 80% Bill then NCTB will return the Bank Guarantee (for Submitted Paper or Art Card) after 28 days of delivery of the textbooks.
Content Paper (80 GSM/60 GSM) and Art Card (230 GSM) will be provided by the NCTB. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment of Tenderer Information Form (e-PG3-2) |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As Per TDS |
As Per TDS |
| Brief Description of Goods,Works or Service | For Printing (Without Paper and Art Card) Binding and Supplying of textbooks of Ibtedaie Class 3-5, Secondary (Bangla and English Version) Class 8-9, Dakhil Class 8-9, SSC/Dakhil Vocational to be distributed free of cost for the Academic Year 2022 |
For Printing (Without Paper and Art Card) Binding and Supplying of textbooks of Ibtedaie Class 3-5, Secondary (Bangla and English Version) Class 8-9, Dakhil Class 8-9, SSC/Dakhil Vocational to be distributed free of cost for the Academic Year 2022 |