View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Due to strict lockdown situation still going on, extension of deadline for submission of tender required. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 04/08/2021 17:30 | 16/08/2021 17:30 |
| Opening Date & Time | 05/08/2021 12:20 | 17/08/2021 12:20 |
| Last date & time for Tender/Proposal Security Submission | 05/08/2021 11:30 | 17/08/2021 11:30 |
| Closing Date & Time | 05/08/2021 12:20 | 17/08/2021 12:20 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Prepared Amendment/ Corrigendum for Extension of Similar Work Experience Time. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | Tenders registered with e-gp are elligible |
Tenders registered with e-gp are elligible |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 3 ( Three) years. The minimum specific experience as a Prime Contractor in construction works of at least 1 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 3 (Three) years, each with a value of at least Tk. 18 (Eighteen) Crore.
Similar experience/work in construction for the package/lot 2. River/Khal Excavation/Re-Excavation work |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 3 ( Three) years. The minimum specific experience as a Prime Contractor in construction works of at least 1 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 18 (Eighteen) Crore.
Similar experience/work in construction for the package/lot 2. River/Khal Excavation/Re-Excavation work |
| Brief Description of Goods,Works or Service | DR-01/ Lot-DR-01/B Dredging work of Padma River from km 31.800 to km 33.300= 1500.00M in connection with "Protection of Establishments from the Erosion of the Padma River on the left Bank at Charghat & Bagha Upazilla of Rajshahi District During the FY 2021-2022. Package no-DR-01/ Lot-DR-01/B. |
DR-01/ Lot-DR-01/B Dredging work of Padma River from km 31.800 to km 33.300= 1500.00M in connection with "Protection of Establishments from the Erosion of the Padma River on the left Bank at Charghat & Bagha Upazilla of Rajshahi District During the FY 2021-2022. Package no-DR-01/ Lot-DR-01/B. |