Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 04/08/2021 10:00 | 10/08/2021 10:00 |
| Eligibility of Consultant | 1. The minimum of years of general experience of the Supplier in the supply of lift and related services as supplier shall be 5 (five) years. 2. The minimum specific experience as supplier in supply of lift of at least 1 (one) no. contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 280.00 (Two Hundred Eighty) Lac. in Government /Semi-Government /Autonomous organization/Private bodies of Bangladesh during last 5 (five) years. Years counting backward from the date of publication of IFT in the e-GP. 3. The minimum amount of liquid assets i.e working capital or credit line(s) of the Supplier shall be Tk. 320.00 (Three Hundred Twenty) lac . The certificate of free fund (liquid asset) must be unconditional and to be issued in favor of related work (Name of the work/lot). Liquid asset must be substantiated by a letter of commitment of banks undertaking for line of credit. Document submitted along with the tender must be issued in between publication date and submission date of the tender. 4. The supplier must posses/submit i) Up-to-date income tax clearance certificate. ii) Up-to-date trade license iii) Up-to-date VAT resistration iv) Up-to-date ABC category contractory and supervisory license from Electricity Licensing Board, GoB. v) Manufacturer authorization letter.(e-PG3-5). vi) Attested copy of documents mentioned in Sl. No. i, ii , iii, iv and original copy of Sl.No. v to be submitted. (A) SPECIAL CONDITIONS FOR CONTRACT & (B) SPECIAL TERMS AND CONDITIONS OF LIFT & ESCALATOR are mentioned in PCC |
1. The minimum of years of general experience of the Supplier in the supply of lift and related services as supplier shall be 5 (five) years. 2. The minimum specific experience as supplier in supply of lift of at least 1 (one) no. contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 280.00 (Two Hundred Eighty) Lac. in Government /Semi-Government /Autonomous organization/Private bodies of Bangladesh during last 5 (five) years. Years counting backward from the date of publication of IFT in the e-GP. 3. The minimum amount of liquid assets i.e working capital or credit line(s) of the Supplier shall be Tk. 320.00 (Three Hundred Twenty) lac . The certificate of free fund (liquid asset) must be unconditional and to be issued in favor of related work (Name of the work/lot). Liquid asset must be substantiated by a letter of commitment of banks undertaking for line of credit. Document submitted along with the tender must be issued in between publication date and submission date of the tender. 4. The supplier must posses/submit i) Up-to-date income tax clearance certificate. ii) Up-to-date trade license iii) Up-to-date VAT resistration iv) Up-to-date ABC category contractory and supervisory license from Electricity Licensing Board, GoB. v) Manufacturer authorization letter.(e-PG3-5). vi) Attested copy of documents mentioned in Sl. No. i, ii , iii, iv and original copy of Sl.No. v to be submitted. (A) SPECIAL CONDITIONS FOR CONTRACT & (B) SPECIAL TERMS AND CONDITIONS OF LIFT & ESCALATOR are mentioned in PCC |
| Opening Date & Time | 05/08/2021 12:00 | 11/08/2021 12:00 |
| PCC--.-- |
The inspections and tests shall be :[ insert type of test, time, place, procedures for carrying out the inspections and tests
[Note: Depending on the type of Goods to be procured, there may be a need to provide for special inspections and/or tests to be carried out. In particular, this will be the case when the Goods are designed specifically for the purpose of the Project in question or where due to the nature of the Goods, there is a need to ensure compliance with certain technical specifications and requirements at an early stage. If there is a need for such special inspections and/or tests, the PCC should mention specific testing methods and the timing or milestones and places where the tests and/or inspections are to be carried out. ] |
The inspections and tests shall be :once after manufacturing at Manufacturing factory in presence of PE representatives (03 Nos PE representatives would attend the Factory inspection program) |
| PCC--.-- | The period of validity of the Warranty shall be : one year. |
The period of validity of the Warranty shall be : one year from the date of successful commissioning |
| PCC--.-- | The amount of Liquidated Damages is 0.1 of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay. The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is10 percent of the final Contract Price of the whole of the Goods and related services.
|
The amount of Liquidated Damages is 0.1 of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay. The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is10 percent of the final Contract Price of the whole of the Goods and related services.
|
| PCC--.-- | The following documents shall also be part of the Contract: Work program in bar chart The schedule of proposed key site management and technical personnel. List of equipments proposed for the project.] |
The following documents shall also be part of the Contract: Work program in bar chart The schedule of proposed key site management and technical personnel. List of equipments proposed for the project.] |
| PCC---- | SPECIAL CONDITIONS FOR CONTRACT
1. Tenderer submits a 5 year’s replacement warranty for spare parts without any cost of 24/7 call back service within an hour call back support. |
SPECIAL CONDITIONS FOR CONTRACT
1. Tenderer submits a one year’s replacement warranty for spare parts without any cost of 24/7 call back service within an hour call back support. |
| PCC---- | SPECIAL CONDITIONS FOR CONTRACT
1. Tenderer submits a 5 year’s replacement warranty for spare parts without any cost of 24/7 call back service within an hour call back support. |
SPECIAL CONDITIONS FOR CONTRACT
1. Tenderer submits a one year’s replacement warranty for spare parts without any cost of 24/7 call back service within an hour call back support. |
| Last date & time for Tender/Proposal Security Submission | 05/08/2021 11:30 | 11/08/2021 11:30 |
| Closing Date & Time | 05/08/2021 12:00 | 11/08/2021 12:00 |
| Brief Description of Goods,Works or Service | Supply and Installation of 04 Nos, 1250 kg Passenger cum Bed Lift at Khulna Sadar Hospital. |
Supply and Installation of 04 Nos, 1250 kg Passenger cum Bed Lift at Khulna Sadar Hospital. |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Technical Specifications Sadar H lift.pdf | Technical Specifications | 308292 | ||
| 2 | TERMS AND CONDITIONS OF LIFT.docx | Terms and Conditions of Lift | 23558 | ||