View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Railways Division :
Organization : Bangladesh Railway Procuring Entity Name : Office of the Divisional Engineer-2, Chittagong
Procuring Entity Code : Procuring Entity District : Chattogram
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : DEN-2/CTG/2020-21/592587/166 Tender/Proposal Status :
App ID : 170493 Tender/Proposal ID : 592587
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Revenue
Source of Funds : Government
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : DEN-2/CTG/2020-21/3258121/37
AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works.
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
30-Jun-2021 23:53 Tender/Proposal Document last selling /
downloading Date and Time :
10-Aug-2021 12:30
Pre - Tender/Proposal meeting Start
Date and Time :
01-Jul-2021 16:53 Pre - Tender/Proposal meeting End
Date and Time :
05-Aug-2021 17:00
Tender/Proposal Closing
Date and Time :
10-Aug-2021 12:50 Tender/Proposal Opening
Date and Time :
10-Aug-2021 12:50
Last Date and Time for Tender/Proposal Security
Submission :
10-Aug-2021 12:30    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

1. A satisfactory completion of similar works of at least Tk. 11 (Eleven) lakhs under 01 (One) number of contract over a period of 05 (Five) years from the date of publication of IFT in the newspaper shall be required.
2. Experience in Civil construction /Re-construction/Repair/Re-building/ Renovation/ Rehabilitation works under any Government/ Autonomous / Semi autonomous/ Directorate/ Corporate organization against a completed contract will be treated as experience in similar works.
3. Required average annual construction turnover shall be greater than Tk. 10 (Ten) lakhs over the last 05 (Five) years.
4. Minimum amount of liquid assets or working capital or credit facilities, net of other contractual commitments of the Tenderer shall be Tk. 8 (Eight) lakhs.
 

Brief Description of Works :

AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 1000
Mode of Payment :
Tender/Proposal Security Valid Up to : 05-Jan-2022
Tender/Proposal Valid Up to : 08-Dec-2021
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works. Pahartali, Chattogram 44000 01-Sep-2021 30-Nov-2021
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Ahsan Habib Designation of Official Inviting Tender/Proposal : DEN,DME,DSTE,DEE,DCO,DTO
Address of Official Inviting Tender/Proposal :
Address: Pahartoli, Chittagong
City: Chittagong
Thana: Khulshi
District: Chattogram - 1000
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 031-2863182
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Corrigendum for Tender Document

Field Name Old Value New Value
PCC--A. General--

The Procuring Entity is
[Name, address]
 

The Procuring Entity is: Director General of Bangladesh Railway represented by Chief Engineer (East) through Divisional Engineer-2, Bangladesh Railway, Chattogram.

PCC--A. General--

The Project Manager is
[Name, address]
 

The Project Manager is Divisional Engineer-2, Bangladesh Railway, Chittagong supported by associated officers and staffs under Divisional Engineer-2.

PCC--A. General--

The Site is located at [location] and is defined in drawings No:
[insert numbers]
 

The Site is located at DRM Compound & Loco Colony, Pahartali, Chattogram and is defined in drawings No: Nil
 

PCC--A. General--

The Works consist of
[state brief summary]
 

The Works consist of AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works.
 

PCC--A. General--

Other documents forming part of the Contract are;

[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]
 

Other documents forming part of the Contract are; None

PCC--A. General--

Possession of the Site to the Contractor shall be given on the following date;

[state date of possession of site]
 

Possession of the Site to the Contractor shall be given on the following date; within 07 (Seven) days after signing of the contract.

PCC--B. Time Control--

The Start Date shall be [insert date ]
[it is the last date when the Contractor shall commence execution of the Works under the Contract]
 

The Start Date shall be 03 (Three) days after giving the possession of the site. 

PCC--B. Time Control--

The Intended Completion Date for the whole of the Works shall be [insert date]
[to be calculated from the start Date]
 

The Intended Completion Date for the whole of the Works shall be 180 (One Hundred Eighty) days from the signing of Contract Agreement.

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.
[usually ten (10) days or may be less]
 

The Contractor shall submit a Programme for the Works within 10 (Ten) days of signing the Contract.

PCC--C. Quality Control--

The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is 12 (Twelve) months.

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

The following additional events shall also be the Compensation Events: None

 

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is 10 (Ten) percent of the contract price.
a) 5% of the total contract price will have to be submitted by Pay order/Bank guarantee as Performance Security by the successful tenderer.
b) 5% of total contract price will be retained as retention money from each progressive payment.
(On completion of the whole works, the first half of total amount retained as Performance Security shall be repaid to the Contractor and the remaining second half will be released after passing over the Defects Liability Period.)
 

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works.

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 15 (Fifteen) percent.

PCC--H. Disputes and Settlement--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]
 

The arbitration shall be conducted in the place mentioned below;
Office of the Chief Engineer (East), Central Railway Building, Bangladesh Railway, Chattogram.
 

TDS/PDS--A. General--

 

The PE is [state name of PE]

 

 

 

The Name of the Tender is:
Brief Description of the Works:

Tender Ref:
Lot No(s):

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

 

The PE is: Director General of Bangladesh Railway represented by Chief Engineer (East) through Divisional Engineer-2, Bangladesh Railway, Chattogram.

The Name of the Tender is: AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works.
Brief Description of the Works: AT PHT (DRM Compound & Loco Colony): Construction and repairing to drain with covered & open drain from PHT Control office to Loco Colony quarter No. M/12 including other allied works.

Tender Ref: DEN-2/CTG/2020-21/592587/166
Lot No(s): Nil

 

TDS/PDS--B. Tender Document--

Allowed to post clarification till [Date and Time]

Allowed to post clarification till 10-Aug-2021 at 12:50 PM

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction  turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be  best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)]
Example:
Estimated Contract Value:  Tk 24 lakh
Contract period:   12 months
Estimated Annual Cash Flow:  Tk 24 lakh
Required average annual construction turn over: Tk 12 lakh, using a multiplier of 0.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The required average annual construction turnover shall be greater than Tk. 10 (Ten) lakhs over the last 05 (Five) years.

TDS/PDS--C. Qualification Criteria--

The minimum amount of liquid assets or working capital or credit facilities of the  Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The minimum amount of liquid assets or working capital or credit facilities, net of other contractual commitments of the Tenderer shall be Tk. 8 (Eight) lakhs.

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

The Minimum Tender Capacity shall be: Not required.

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of at least Tk [insert amount] under [state number] of contract(s) over a period of [state number] years shall be required.

[the minimum value of the similar works under a single or multiple number of  contract(s) is recommended to be between 50  and 75 percent of the estimated cost, rounded off to nearest Taka  thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]

[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package]
 

A satisfactory completion of similar works of at least Tk.11 (Eleven) lakhs under 01 (One) number of contract over a period of 05 (Five) years from the date of publication of IFT in the newspaper shall be required.
[Note: Experience in Civil construction /Re-construction/Repair/Re-building/ Renovation/ Rehabilitation works against a completed contract will be treated as experience in similar works]
 

TDS/PDS--D. Tender Preparation--

Tenderer shall submit with its Tender, the following additional documents:

Tenderer shall submit with its Tender, the following additional documents:

1. Updated copy of latest Income Tax clearance certificate from the issuing organization.
2. Updated copy of latest VAT Registration certificate from the issuing organization.
3. Updated copy of Trade License from the issuing organization.
4. Certificate of Experience for satisfactory completion of works (ITT-9.1) with recorded final value issued by the competent authority (Not below the rank of Divisional Engineer/Executive Engineer or equivalent officer) from concerned organization of public sector.

TDS/PDS--D. Tender Preparation--

The Tender Validity period shall be [state number] days.

[normally 60 to 90 days deemed reasonable]
 

The Tender Validity period shall be 120 (One Hundred Twenty) days.

TDS/PDS--D. Tender Preparation--

The amount of the Tender Security shall be [ state amount ]
[note: Not exceeding three percent (3%) of the official estimated cost but as a fixed amount] 

 

The amount of the Tender Security shall be Tk. 44,000.00 (Forty Four Thousand only) submitted to FA&CAO (East), Bangladesh Railway, CRB, Chattogram.

TDS/PDS--E. e-Tender Submission--

The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m]
[state date, e.g 15 June,2011  ].
 

The deadline for lodgment of e-Tenders is 10-Aug-2021 at 12:50 PM

 