Amendment / Corrigendum No. : 4
|
|
| Amendment / Corrigendum Text : | Update Notice |
| Field Name | Old Value | New Value |
|---|---|---|
| Opening Date & Time | 19/07/2021 12:00 | 19/07/2021 13:00 |
| Closing Date & Time | 19/07/2021 12:00 | 19/07/2021 13:00 |
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Update PCC |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PCC--.-- | The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section. Both side four color cover printing shall be done for all textbook. All four color books contents page will be 80 GSM and All single color books contents page will be 60 GSM as specified in technical specification [section 7]
Within first 40 days supplier must deliver 50% of the total deliverable of the contract products and rest 50% of the total deliverable of the contract products shall be delivered with in rest 30 days.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG |
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section. Both side four color cover printing shall be done for all textbook. All four color books contents page will be 80 GSM and All single color books contents page will be 60 GSM as specified in technical specification [section 7]
Within first 40 days supplier must deliver 50% of the total deliverable of the contract products and rest 50% of the total deliverable of the contract products shall be delivered with in rest 30 days.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG Last forma of Arts and Crafts Book will be printed in four color and paper will be 80GSM printing paper with following specification. All other books will be as stated in price and delivery schedule as well as technical specification. (I) White Printing Paper: Ebtedaye and Secondary books (Four color textbook):
(II) White Printing Paper: Dakhil, Secondary (Bangla and English Version), Vocational (SSC & Dakhil) And Technical (Trade Book)
|
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | amendment of document |
| Field Name | Old Value | New Value |
|---|---|---|
| Brief Description of Goods,Works or Service | For Printing (With Paper & Art Card), Binding and Supplying of textbooks of Ebtedayee Class 1-2, Secondary (Bangla and English Version) Class 6-7, Dakhil Class 6-7 and Technical (Trade book) to be distributed free of cost for the Academic Year 2022. |
For Printing (With Paper & Art Card), Binding and Supplying of textbooks of Ebtedayee Class 1-2, Secondary (Bangla and English Version) Class 6-7, Dakhil Class 6-7 and Technical (Trade book) to be distributed free of cost for the Academic Year 2022. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment of Document. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | as per tds |
as per tds |
| PCC--.-- | The PE is [insert complete name of the PE]. |
The Procuring Entity is: Member(Textbook) National Curriculum and Textbook Board, Bangladesh Room # 301 ( 2nd Floor), 69-70, Motijheel Commercial Area Dhaka-1000, Bangladesh Telephone # : 02-9550805 E-mail: membertextbook@nctb.gov.bd |
| PCC--.-- | The site(s)/ point(s) of delivery is/are: [ insert name(s) and detailed information on the location(s) of the site(s)] |
|
| PCC--.-- |
For notices, the PE’s contact details shall be: |
For notices, the PE’s contact details shall be: Member(Textbook) National Curriculum and Textbook Board, Bangladesh Room # 301 ( 2nd Floor), 69-70, Motijheel Commercial Area Dhaka-1000, Bangladesh Telephone # : 02-9550805 E-mail: membertextbook@nctb.gov.bd
For notices, the Supplier’s contact details shall be: |
| PCC--.-- | The scope of Supply shall be defined in: [insert “section 6, Schedule of Supply” ] or [At the time of awarding the Contract, the PE shall specify any change in the Scope of Supply with respect to Section 6, Schedule of supply included in the E-TD. Such changes may be due, for instance, if the quantities of goods and related Services are increased or decreased at time of award] |
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section. Both side four color cover printing shall be done for all textbook. All four color books contents page will be 80 GSM and All single color books contents page will be 60 GSM as specified in technical specification [section 7]
Within first 40 days supplier must deliver 50% of the total deliverable of the contract products and rest 50% of the total deliverable of the contract products shall be delivered with in rest 30 days.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG |
| PCC--.-- | The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The outer packing may be clearly marked on at least four slides as follows: |
The packing, marking and documentation inside and outside the packages shall be: |
| PCC--.-- |
The documents to be furnished by the Supplier shall be as follows: |
The documents to be furnished by the Supplier shall be as follows:
c. manufacturer’s/ supplier’s warranty certificate (if any);
|
| PCC--.-- | The Prices charged for the Goods supplied and the Related services performed [insert “shall” or “shall not”, as appropriate] be adjustable.
If prices are adjustable, the following method shall be used to calculate the price adjustment [see attachment to these PCC for a sample Price Adjustment Formula] |
|
| PCC--.-- |
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it.
The interest rate that shall be applied is [ %] percent |
The payment-delay period after which the PE shall pay interest: N/A |
| PCC--.-- | The method and conditions of payment to be made to the Supplier under this Contract shall be as follows:
(a) Advance Payment: [usually ten (10)] percent of the Contract Price shall be paid within thirty (30) days of signing of the Contract, and upon submission of claim and a bank guarantee for equivalent amount valid until the Goods are delivered and in the form provided in the E-TD (PG3-10). |
The method and conditions of payment to be made to the Supplier under this Contract shall be as follows:
Until warranty period if any supplied textbook found defective, supplier must replace textbook within 15 (Fifteen) days. Remaining 20% payment will not be paid if any unsolved claim exists. Remaining 20% of the contract price shall be paid after receiving the Post Landing Inspection (PLI) report from the approved Inspection Agent; If necessary, authority may arrange further inspection by nominated NCTB / Ministry of Education officials. |
| PCC--.-- |
Payments shall be made in no case later than the days [Indicate the days] after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. |
Payments shall be made in no case later than the days 56 after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. |
| PCC--.-- |
The inspections and tests shall be :[ insert type of test, time, place, procedures for carrying out the inspections and tests
[Note: Depending on the type of Goods to be procured, there may be a need to provide for special inspections and/or tests to be carried out. In particular, this will be the case when the Goods are designed specifically for the purpose of the Project in question or where due to the nature of the Goods, there is a need to ensure compliance with certain technical specifications and requirements at an early stage. If there is a need for such special inspections and/or tests, the PCC should mention specific testing methods and the timing or milestones and places where the tests and/or inspections are to be carried out. ] |
The inspections and tests shall be: |
| PCC--.-- | The period of validity of the Warranty shall be : [ insert the period of validity of the warranty] |
|
| PCC--.-- | The Supplier shall correct any defects covered by the Warranty within [insert period, i.e. number of days] of being notified by the PE of the occurrence of such defects. |
The Tenderer must Repair and Replace any defective goods (textbooks) which is covered by the warranty within 14 (fourteen) days of being notified by the Procuring Entity of the occurrence of such defects.Note:If the textbooks are found defective within the warranty period (like page or forma missing, displacement of page or forma or cover) after delivery to the destinations, upon receipt of notice from the Procuring Entity (PE) the supplier shall, within 14 (fourteen) days expeditiously repair or replace the defective textbooks, at no cost to the Procuring Entity. Otherwise the total cost of that defective book will be deducted from their bill or PG. |
| PCC--.-- | The amount of Liquidated Damages is [insert between 0.05 and 0.10] of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 35.1 above
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is [insert ≤ ten (10)] percent of the final Contract Price of the whole of the Goods and related services.
|
The amount of Liquidated Damages is 0.10 percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay. The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is ten (10) percent of the final Contract Price of the whole of the Goods and related services. |
| PCC--.-- |
The name of the Adjudicator[insert the name of the Adjudicator] |
The Chairman In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Engineers, Bangladesh (IEB). |
| PCC--.-- | Arbitration shall take place in: [insert the name of the Place and addresses] |
Arbitration shall take place in: Dhaka, Bangladesh. |
| PCC--.-- | The following documents shall also be part of the Contract: [insert the name of the documents] |
|
| TDS/PDS--A. General-- | The PE is :[state name of PE]
The number, identification and name of lots comprising the Tender are:
[state number, list the lots and related Goods with identification] |
Member (Textbook) |
| TDS/PDS--A. General-- | The source of public fund is [state source, GoB or other source of funds]. |
The source of public fund is GoB. |
| TDS/PDS--A. General-- | The name of the Development Partner is [state name of Development Partner] |
The name of the Development Partner is: N/A |
| TDS/PDS--A. General-- | Tenderers from the following countries are not eligible: [state the name of countries] |
Tenderers from the following countries are not eligible: ISRAIL |
| TDS/PDS--A. General-- | Goods and related Services from the following counties are not eligible: [state the name of countries] |
Goods and related Services from the following counties are not eligible: ISRAIL |
| TDS/PDS--B. e-Tender Document-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till: As mentioned at Tender Notice. |
| TDS/PDS--B. e-Tender Document-- | Pre- Tender meeting [Date & Time] |
Pre- Tender meeting will be held as stated in Tender Notice |
| TDS/PDS--B. e-Tender Document-- | A Pre- Tender meeting shall not be held.
The Pre- Tender meeting shall be held through e-GP System. |
|
| TDS/PDS--C. Qualification Criteria-- | The satisfactory completion of supply of similar Goods of minimum [state value] under maximum [state number] contracts in the last [state number] of years. i.e. years counting backward from the date of publication of IFT in the e-GP System The minimum specific experience as Supplier in supply of similar Goods of at least [state number] contract(s) successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[the minimum number of contracts will depend upon the size and type of supply of goods, and the Procuring Entity should make its own judgement based upon its experience in the supply sector. For example, for large supply, it could be two (2) contract of similar nature during the last three (3) years or five (5) (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper] |
The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 01 (one) years.
If a tenderer is responsive for more than one tender under this HOPE, then tenderer must comply individual specific experience certificate for each tender. In this case if less specific experience found TEC will consider as non-responsive for insufficient specific experience. |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Tk. [state value] |
The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Tk. 20,900,000 |
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its e-Tender the following additional documents:
|
The Tenderer shall submit with its Tender the following additional documents: |
| TDS/PDS--D. Tender Preparation-- |
Tenders are being invited for [state single lot] |
|
| TDS/PDS--D. Tender Preparation-- | After sales service is: [state “required” or “ not required”] |
After sales service is: Not Required |
| TDS/PDS--D. Tender Preparation-- |
Manufacturer’s authorization is: [State “required” or “not required”]
|
|
| TDS/PDS--D. Tender Preparation-- | The Tender validity period shall be [sate days] days.
|
|
| TDS/PDS--D. Tender Preparation-- | The Tender security at the percentage [state percentage]
|
The Tender security at the percentage between 2 to 3. |
| TDS/PDS--D. Tender Preparation-- | The amount of the Tender Security shall be [ state amount ]
|
|
| TDS/PDS--E. Tender Submission-- | The deadline for lodgement of e-Tenders is [state time, and identify a.m or p.m, i.e 10.30 a.m]
|
|
| TDS/PDS--G. Contract Award-- |
The maximum percentage by which quantities per item may be increased is [state percentage]. |
|
| TDS/PDS--G. Contract Award-- |
The amount of Performance Security shall be ten [ state percentage] percent of the Contract Price. |
|
| Brief Description of Goods,Works or Service | For Printing (With Paper & Art Card), Binding and Supplying of textbooks of Ebtedayee Class 1-2, Secondary (Bangla and English Version) Class 6-7, Dakhil Class 6-7 and Technical (Trade book) to be distributed free of cost for the Academic Year 2022. |
For Printing (With Paper & Art Card), Binding and Supplying of textbooks of Ebtedayee Class 1-2, Secondary (Bangla and English Version) Class 6-7, Dakhil Class 6-7 and Technical (Trade book) to be distributed free of cost for the Academic Year 2022. |