1. All tenderer(s) registered in e-GP are eligible to participate in the tender if they are otherwise qualified. 2. Tenderer(s) forming JVCA in accordance with respective clauses stated in the tender document and as per latest circular issued by CPTU vide memo no. IMED/CPTU/ 262/2011-1192 dated 26/07/2015 may participate in the tender. Specific Experience for JVCA:Requirements for Lead Partner of JVCA The minimum Specific experience of successful completion of similar nature of Road work amounting to Tk. 12.50 crore in a single contract having minimum Earthwork of 85,000 Cubic meter, Aggregate Base type-I work of 5500 Cubic meter, Dense Bituminous Surfacing Base/ Wearing course of 1850 Cubic meter within the last 10 years. Requirements for other Partner(s) of JVCA The minimum Specific experience of successful completion of similar nature of Road work amounting to Tk. 312.50 Lac in a single contract having minimum Earthwork of 21,250 Cubic meter, Aggregate Base type-I work of 1375 Cubic meter, Dense Bituminous Surfacing Base/ Wearing course of 462.50 Cubic meter within the last 10 years. 3. The tenderer(s) must fulfill the following requirements a) A minimum general construction experience of 05 years. b) The minimum Specific experience of successful completion of similar nature of Road work amounting to Tk. 12.50 crore in a single contract having minimum Earthwork of 85,000 Cubic meter, Aggregate Base type-I work of 5500 Cubic meter, Dense Bituminous Surfacing Base/ Wearing course of 1850 Cubic meter within the last 10 years . c) Minimum annual construction Turnover of Taka 17.50 crore over best 5 years of last 10 years. d) Minimum Liquid asset of Taka 5.75 crore. e) Rate Analysis is required for the BoQ item code no.02/06/02,02/08/01, 03/02/01, 03/03/01 and 03/10/02(b).
Widening of existing road embankment strenthening and widening of existing pavement by Sub-Base, Aggregate Base Type-I,DBS-Wearing Course, Construction & Establishing of RCC Palisiding , KM Post, Guide post, Sign Signal, Grass turfing & Road Marking at Ch.00+000 to 9.310 km under " Improvement of Faridpur (Badarpur)- Salta- Sonapur- Mukshudpur Road" Project under Road division Faridpur during the year 2015-16 (Package no. WD-01).