Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Tecnical Problem |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk=280.00 Lac over the best three (3) years from the last five (5) years counting backward from the date of publication of IFT Notice in the e-GP website |
The required average annual construction turnover shall be greater than Tk=140.00 Lac over the best three (3) years from the last five (5) years counting backward from the date of publication of IFT Notice in the e-GP website |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of works of at least 01(One) contract of similar nature, complexity and methods/construction technology with a value of at least Tk= 160.00lac under a single contract within the last 3 (Thiree) years counting backward from the date of publication of IFT notice in the e-GP website shall be required. |
A satisfactory completion of works of at least 01(One) contract of similar nature, complexity and methods/construction technology with a value of at least Tk= 110.00lac under a single contract within the last 3 (Thiree) years counting backward from the date of publication of IFT notice in the e-GP website shall be required. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Technical Problem |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As Per STD and PPA-2006 andPPA-2006 and PPR-2008(With its all amendments). |
As Per STD and PPA-2006 andPPA-2006 and PPR-2008(With its all amendments). |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of works of (100mm x 38mm or 75mmx38mm) dia. Deep Tube well With Submersible Pump (TSP),complexity and methods/construction technology with a value of at least Tk= 140.00lac under a single contract within the last 3 (Thiree) years counting backward from the date of publication of IFT notice in the e-GP website shall be required. |
A satisfactory completion of works of at least 01(One) contract of similar nature, complexity and methods/construction technology with a value of at least Tk= 160.00lac under a single contract within the last 3 (Thiree) years counting backward from the date of publication of IFT notice in the e-GP website shall be required. |
| Brief Description of Goods,Works or Service | Construction of Community Based Water Supply Scheme by Installing of (100mm x 50mm) dia 42nos. Deep Tube-well With Submersible Pump (Capacity 1.5 HP) Different Upazila in Satkhira District Under Safe Water Supply Through Out The Country (PSWSC) Project Department of Public Health Engneering (FY: 2021-2022). |
Construction of Community Based Water Supply Scheme by Installing of (100mm x 50mm) dia 42nos. Deep Tube-well With Submersible Pump (Capacity 1.5 HP) Different Upazila in Satkhira District Under Safe Water Supply Through Out The Country (PSWSC) Project Department of Public Health Engneering (FY: 2021-2022). |