1. A satisfactory Compilation of Copper Conductor/Cable Supply works of tk 90,000,00/-( Taka Ninety Lakh ) in a single contact over a period 03 (Three)
Years be required. Years counting backward from the date of publication of IFT in the News paper.
2.Minimum amount of Liquid asset Tk. 70,000,00/-(Taka Seventy Lakh) only.
3. Update valid Trade Licence, BIN, Tax Certificate.
4. As per ITT-Clause no 31.2(a) Tender security will be prepared from the bank registered with e GP system in favour of the Power Grid Company Of
Bangladesh Ltd. Either in the form of a bank draft or pay order.
5. The bidder should arrange a Factory Acceptance Test (FAT) of Copper Conductor in front of a representative of PE.The Bidder must borne all the cost of
FAT. Place: Any Lab /Factory/University having such kind of Testing Facility.
6. Manufacturer :Estern/BRB/BBS/Paradise cables Limited Bangladesh/Bangladesh Cable Industries/made by Japan,Europe countries or Equivalent.
7. Shall be Submit Catalog of the copper conductor and thechenical specification.
8. Warrenty certificate of conductor if any.
|