As Per TDS
1. Contractor will be disqualified, if the total quoted rate in BOQ is more than 10% less or more than 10% high of official estimated cost according to latest ammendment of PPR- 2008.
2. it is to be noted that quoted boring rate should be increased proportionately according to the depth of the well otherwise tender would be consider non-responsive without acceptable clarification.
Installation of 286 Nos Deep Tube well with No. 6 Hand Pump at Eleven Unions of Kotalipara in Gopalganj District , Department of Public Health Engineering,Under Project for Safe Water Supply Throughout The country ( PSWSC) .FY-2021-2022.