View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | * Changes in Equipment Requirement in TDS. |
| Field Name | Old Value | New Value | |||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (compaction test etc.) should be carried by the Contractor himself. 7. Bill would be given as per post work calculation provided by Task Force/Chief Monitoring, BWDB. |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (compaction test etc.) should be carried by the Contractor himself. 7. Bill would be given as per post work calculation provided by Task Force/Chief Monitoring, BWDB. |
|||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | (a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature (such as Embankment Construction/Re-Sectioning/Khal Excavation/Re-Excavation etc), complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 750 (Seven Hundred Fifty) lacs.
|
(a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature (such as Embankment Construction/Re-Sectioning/Khal Excavation/Re-Excavation etc), complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 700 (Seven Hundred) lacs.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
* Absence of equipments will disqualify any contractor in evaluation stage. |
|||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Construction of Embankment Beside the Right Bank of Shikalbaha-Chandkhali-Boalkhali River from Km 0.000 to Km. 4.710 (=4710.00m.) in Kasiaish & Ashia Union of Patiya Upazilla, Dist- Chattogram in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" under Chattogram O&M Division-1, BWDB, Chattogram during FY 2021-22. |
Construction of Embankment Beside the Right Bank of Shikalbaha-Chandkhali-Boalkhali River from Km 0.000 to Km. 4.710 (=4710.00m.) in Kasiaish & Ashia Union of Patiya Upazilla, Dist- Chattogram in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" under Chattogram O&M Division-1, BWDB, Chattogram during FY 2021-22. |