View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum due to Document correction. |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Completion Date(Lot No : 01) | 15/06/2023 | 15/12/2022 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Eligibility of Consultant | As per TDS |
As per TDS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The Works consist of [state brief summary, including relationship to other Contracts under the Project] |
The Works consist of RCC works , Eath work etc |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The Project Manager isUpazila Engineer |
The Project Manager is Upazzila Engineer, Raipura, Narsingdi |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
[insert name(s)] |
Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
1. Construction Project Manager (Graduate in Civil Engg.) NB:- Same as TDS 17.1 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The Contractual matters between the PE and the Contractor shall be decided by Project Director. |
The Contractual matters between the PE and the Contractor shall be decided by Manager. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
The minimum insurance cover shall be:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | Other documents forming part of the Contract are; None |
Other documents forming part of the Contract are;
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--B. Time Control-- | Commencement Date of Works shall be as follows; As mentioned in NOA |
Commencement Date of Works shall be as follows; within 7days of signing contract agreement. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--C. Quality Control-- | The Defects Liability Period is twelve (12) months |
The Defects Liability Period is twelve (12) months |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is 5% (Five percent) percent |
The proportion of payments to be retained is 10% (Ten percent) percent of progress payment. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The date by which “as-built” drawings are required is Not Applicable
The date by which operating and maintenance manuals are required is Not Applicable |
The date by which “as-built” drawings are required is Not Applicable |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The name of the Development Partner is :Not Applicable |
The name of the Development Partner is :N/A |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | Tenderers from the following countries are not eligible
Israel |
Tenderers from the following countries are not eligible : Israel |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | Materials, Equipments and associated services from the following countries are not eligible:
Israel |
Materials, Equipments and associated services from the following countries are not eligible: Israel |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (five) years. Years counting backward from the date of publication of IFT in the newspaper
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of similar nature, complexity and methods/construction (BC road Improvement) technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 350 Lakh ( Three crore Fifty lakh). years counting backward from the date of publication of IFT in the newspaper] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 (five) years. Years counting backward from the date of publication of IFT in the newspaper
The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract(s) of similar nature , complexity and methods/construction ( Improvement of Road by RCC ) technology successfully completed within the last 5 (Five) years under Public sector with a value of at least Tk. 350 Lakh ( Three hundred Fifty lakh). years counting backward from the date of publication of IFT in the newspaper] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 470 Lakh ( Four Crore Seventy Lakh) over the last 5 (Five) years. years counting backward from the date of publication of IFT in the newspaper
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 120 Lakh (One crore Twenty Lakh).
Supporting necessary documents required are as follows: |
The required average annual construction turnover shall be greater than Tk 700 Lakh ( Seven Hundred Lakh) over the last 5 (Five) years. Years counting backward from the date of publication of IFT in the newspaper
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 140 Lakh (One Hundred Forty Lakh).
Supporting necessary documents required are as follows: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be:370 Lakh( Three crore Seventy lakh)
The following formulae shall be used to calculate the Tender Capacity
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be: 360 Lakh( Three Hundred Sixty lakh)
The following formulae shall be used to calculate the Tender Capacity
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
|
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [state amount] |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None. |
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: : N/A |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents: None |
The Tenderer shall submit with its Tender the following additional documents: - (1) Written confirmation authorizing the signatory of the Tenderer including National ID to submit the e-Tender, as stated under ITT Sub Clause 39.4; (2) Valid Trade license to be mapped from e-GP Common document library of the Tenderer ;
(3) Documentary evidence of Tax Identification Number (TIN) and Value Added Tax (VAT) as a proof of taxation obligations as stated under ITT Sub Clause 5.10 to be mapped from e-GP Common document library of the Tenderer; |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is as per e-GP Notice. |
The deadline for lodgement of e-Tenders is : as per e-GP Tender Notice. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be 10 percent of the Contract Price, but Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ] |
The amount of Performance Security shall be 5 (five) percent of the Contract Price, Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | NAR/VR/NEW/RCC/W-52 |
NAR/VR/NEW/RCC/W-52 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tender/Proposal Security (Amount in BDT)(Lot No : 01) | 1400000.0 | 1200000 |