Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Change in BOQ |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 28/11/2021 15:00 | 02/12/2021 15:00 |
| Eligibility of Consultant | As per TDS/STD. Special Condition : 1.All cost of survey, Drawing and Design will be bear by the Tenderer. 2. No treatment plant will be constructed If water quality test report within Bangladesh standard limit. In this case PART K of BOQ will be zero. 3. PART K of BOQ must not be less than 10% of its cost. If any tenderer quoted rate of PART K is less than 10% of its cost he/she will be non-responsive without any query. The total cost of PART K is Tk- 6414888.75 4. Pipe line network will be done after completion of Production Tube well and Treatment Plant (if necessary). 5. After completion of all construction work and distribution line the operation of the plant, all types of maintenance and water distribution to the consumer will be maintained by the tenderer till 18 (Eighteen) month. The electric bill, operation cost, security guard salary, chemical cost etc. will be bear by the tenderer. 6. After successful completion of operation of 18 (Eighteen) Month the tenderer will Hand over it to the local committee. 7. The retention money will be released after handover of the piped water supply scheme. |
As per TDS/STD. Special Condition : 1.All cost of survey, Drawing and Design will be bear by the Tenderer. 2. No treatment plant will be constructed If water quality test report within Bangladesh standard limit. In this case PART K of BOQ will be zero. 3. PART K of BOQ must not be less than 10% of its cost. If any tenderer quoted rate of PART K is less than 10% of its cost he/she will be non-responsive without any query. The total cost of PART K is Tk- 6414888.75 4. Pipe line network will be done after completion of Production Tube well and Treatment Plant (if necessary). 5. After completion of all construction work and distribution line the operation of the plant, all types of maintenance and water distribution to the consumer will be maintained by the tenderer till 18 (Eighteen) month. The electric bill, operation cost, security guard salary, chemical cost etc. will be bear by the tenderer. 6. After successful completion of operation of 18 (Eighteen) Month the tenderer will Hand over it to the local committee. 7. The retention money will be released after handover of the piped water supply scheme. |
| Opening Date & Time | 29/11/2021 12:20 | 05/12/2021 12:20 |
| Last date & time for Tender/Proposal Security Submission | 28/11/2021 16:00 | 02/12/2021 16:00 |
| Closing Date & Time | 29/11/2021 12:20 | 05/12/2021 12:20 |
| Brief Description of Goods,Works or Service | Piped water supply scheme at Debiganj Upazila in Panchagarh District with 02 nos Test Tubewell, 02 nos Production well, 02 nos Pump House, 01 Nos R.C.C Over Head Water Tank, Mechanical works, Electrical Works, Pipe Line/water distribution Networks, 01 Nos Arsenic and Iron Removal Plant (Capacity:25 m3/hr) etc. under Safe Water Supply Through Out The Country Project. |
Piped water supply scheme at Debiganj Upazila in Panchagarh District with 02 nos Test Tubewell, 02 nos Production well, 02 nos Pump House, 01 Nos R.C.C Over Head Water Tank, Mechanical works, Electrical Works, Pipe Line/water distribution Networks, 01 Nos Arsenic and Iron Removal Plant (Capacity:25 m3/hr) etc. under Safe Water Supply Through Out The Country Project. |