As per Tender Documents.
R.M.O E/M works service at Osmani Int'l Airport, Sylhet during the year 2020-2021 (S.H: Outer Painting of the Tunnel, roof top, rotunda column, lift column at 2 Nos Boarding Bridge i/c MDB, SDB, Street light pole & different type light fittings, outdoor feeder box, air condition machine(outdoor) at OIA, Sylhet.)