Tenderer shall submit with its Tender, the following additional documents:
1. Tederer Should have Similar Working Experiences.
2. A Programme & Work Schedule must be submitted for this Works within 07 days through Engineer-Incharge to PE after signing of the Contract.
3. As per work schedule, after execution of work, Measurement Certificate should be prepared & Signed by Engineer-Incharge & Contractor.
4. Before submitting the tender the tenderer is to be aware to submit a Consent Letter to PE so that he is aware of this. Failure to submit the consent letter will disqualify the tenderer.
5. Valid Trade License, Income Tax Certificate, VAT, TIN.
Air Cooler Maintenance Work at Haripur,Meghnaghat,Madanganj,Sonargaon Sub Station under GMD Dhaka(East) PGCB Ltd.