As Per TDS
IRIDP-3/JLK/DW-10 (a) Improvement of Satghor-Talukder hat(At Kawkhali Upazila) via Goal Bari road Ch. 00m-450m [RAJAPUR] [Road ID 542844024]
(b) Construction of 1no 2x3mx3m culvert at Ch. 00m on the same road.
(c) Construction of 2no 1mx1m culvert at Ch. 15m & 240m on the same road.
(d) Improvement of Charakhali hat w.charakhali GPS via Isa Farazi house road Ch. 00m-370m [RAJAPUR] [Road ID 542844061] [Salvage Cost: 608424 Taka]
(e) Construction of 1no 2x 3mx3m culvert at Ch. 370m on the same road.
(f) Construction of 3no 1mx1m culvert at Ch. 155m, 250m & 340m on the same road.
(g) Improvement of Palot post office - palot grils high school via sharif bari Mahamudia Madrasha road Ch. 00m-560m [RAJAPUR] [Road ID 542844133] [Salvage Cost: 497372 Taka]
(h) Construction of 1no 1mx1m culvert at Ch. 292m on the same road.
(i) Construction of 1no 1.50mx1.50m culvert at Ch. 5500m on the same road.