View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Changes in BOQ and Official Estimated Cost due to Design change. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. 7. Acceptance of CC block is subjected to approval of Task Force,BWDB,Dhaka. 8. Only work completion certificates (completed/ongoing) will be considered for the calculation of Average Annual Turnover and for other qualification criteria of the tenderer. Payment certificates will not be considered for Turnover calculation. |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. 7. Acceptance of CC block is subjected to approval of Task Force,BWDB,Dhaka. 8. Only work completion certificates (completed/ongoing) will be considered for the calculation of Average Annual Turnover and for other qualification criteria of the tenderer. Payment certificates will not be considered for Turnover calculation. |
| TDS/PDS--C. Qualification Criteria-- | (a) The required average annual construction turnover shall be greater than Tk 1100 (One Thousand One Hundred) lacs each year over the last 5 (five) years. (b) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 400 (Four Hundred) lacs. (c) Not Applicable.
|
(a) The required average annual construction turnover shall be greater than Tk 1100 (One Thousand One Hundred) lacs each year over the last 5 (five) years. (b) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 370 (Three Hundred and Seventy) lacs. (c) Not Applicable.
|
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) shall execute the following specific components of the proposed Works: None. |
The Nominated Subcontractor(s) shall execute the following specific components of the proposed Works: None. |
| Brief Description of Goods,Works or Service | Remaining Bank Protection work on the left bank of Sangu river at Tulatali village in U.P.Charati from KM 32.110 to KM 32.410 (=300.00m.) and KM 32.660 to KM 33.260 (=600.00m.) total =900.00m. in Satkania Upazila under the Project "Bank Protection work on the both banks of Sangu & Dalu river in Lohagara and Satkania Upazillas of Chittagong District" during the year 2021-2022. |
Remaining Bank Protection work on the left bank of Sangu river at Tulatali village in U.P.Charati from KM 32.110 to KM 32.410 (=300.00m.) and KM 32.660 to KM 33.260 (=600.00m.) total =900.00m. in Satkania Upazila under the Project "Bank Protection work on the both banks of Sangu & Dalu river in Lohagara and Satkania Upazillas of Chittagong District" during the year 2021-2022. |
| Tender/Proposal Security (Amount in BDT)(Lot No : e-GP-05?ADP/RPW/Tulatoli/Sangu/2020-21) | 2850000.0 | 2710000 |