Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Changes in BOQ and Official Estimated Cost due to Design change. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant |
Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. 7. Acceptance of CC block is subjected to approval of Task Force,BWDB,Dhaka. 8. Only work completion certificates (completed/ongoing) will be considered for the calculation of Average Annual Turnover and for other qualification criteria of the tenderer. Payment certificates will not be considered for Turnover calculation. |
Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. 7. Acceptance of CC block is subjected to approval of Task Force,BWDB,Dhaka. 8. Only work completion certificates (completed/ongoing) will be considered for the calculation of Average Annual Turnover and for other qualification criteria of the tenderer. Payment certificates will not be considered for Turnover calculation. |
| TDS/PDS--C. Qualification Criteria-- | (a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature (such as River bank/Sea dyke protective work/Groyne/Spur etc), complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 1200 (One Thousand and Two Hundred) lacs.
|
(a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature (such as River bank/Sea dyke protective work/Groyne/Spur etc), complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 1100 (One Thousand and One Hundred) lacs.
|
| TDS/PDS--C. Qualification Criteria-- | (a) The required average annual construction turnover shall be greater than Tk 1620 (One Thousand and Six Hundred Twenty) lacs each year over the last 5 (five) years. (b) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 540 (Five Hundred Forty) lacs. (c) Not Applicable.
|
(a) The required average annual construction turnover shall be greater than Tk 1525 (One Thousand Five Hundred and Twenty Five) lacs each year over the last 5 (five) years. (b) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 510 (Five Hundred and Ten) lacs. (c) Not Applicable.
|
| TDS/PDS--C. Qualification Criteria-- | (d) The minimum Tender Capacity shall be: Tk 1150 (One Thousand and One Hundred Fifty) lacs. In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%. |
(d) The minimum Tender Capacity shall be: Tk 1100 (One Thousand and One Hundred) lacs. In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%. |
| Brief Description of Goods,Works or Service | Remaining Bank Protection work on the left bank of Sangu river at Amilaish village of Amilaish U.P. from KM 39.669 to KM 40.819 (=1150.00m.) in Satkania Upazila under the Project "Bank Protection work on the Both Banks of Sangu & Dalu river in Lohagara and Satkania Upazillas of Chittagong District" during the year 2021-2022. |
Remaining Bank Protection work on the left bank of Sangu river at Amilaish village of Amilaish U.P. from KM 39.669 to KM 40.819 (=1150.00m.) in Satkania Upazila under the Project "Bank Protection work on the Both Banks of Sangu & Dalu river in Lohagara and Satkania Upazillas of Chittagong District" during the year 2021-2022. |
| Tender/Proposal Security (Amount in BDT)(Lot No : e-GP-13/ADP/RPW/Amilaish/Sangu/2021-2022) | 4200000.0 | 3810000 |