a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration and TIN certificate. b) It is the duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file. c) Vat & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. d) Tender evaluation will be done following the latest gazette /circular from CPTU. e) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted. f) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. g) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. h) Quantity and quality of work will be checked by BWDB's Task Force or any other competent authority. i) Photo and video must have to be taken by the contractor at a different angle during pre-work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard. j) All other criteria stated in the tender document.
Special Note:
(a) Notification of Award (NoA) and work order will be issued after approval of "Inter Item Cost Adjustment" of the project by the competent authority (i.e. MoWR).
(b) Amount or Quantity may varied (increase/decrease) by considering the project aid.
Construction of submersible embankment with Slope/Crest protection work in Dakshiner Haor sub-project in between km. 6.900 to km 12.665 = 1.885 km (Type A=0.80 km & Type D=1.085km) with Thunder/lighting Arrestor including Tree Plantation in C/W Haor Flood Management & Livelihood Improvement Project under Kishoregonj WD Division, BWDB, Kishoregonj during the FY 2021-22. (Package no. BWDB/Kish/HFMLIP/PW-38).