Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Changes in Item Description. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 16/01/2022 15:00 | 20/01/2022 15:00 |
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips,cement,sand,geo-bags,geo-textile,cylinder, block core test etc.) should be carried by the Contractor himself. |
| Opening Date & Time | 16/01/2022 17:00 | 20/01/2022 17:00 |
| Last date & time for Tender/Proposal Security Submission | 16/01/2022 16:00 | 20/01/2022 16:00 |
| Closing Date & Time | 16/01/2022 17:00 | 20/01/2022 17:00 |
| Brief Description of Goods,Works or Service | Remaining work of Bank Protection work on the right bank of Sangu river km.1.500 to km.2.000 = 0.500km. at Tailar Dwip of Haildhar Union under Polder No.-63/1B in connection with "Rehabilitation of Coastal Polder No.-62 (Patenga), 63/1A (Anowara), 63/1B (Anowara & Patiya) in Chittagong District" in Upazila- Anowara, District- Chittagong during the year 2016-17 & Strengthening of Bank Protection work along the right bank of Sangu River from KM 1.860 to KM 2.000 during the year 2021-2022. |
Remaining work of Bank Protection work on the right bank of Sangu river km.1.500 to km.2.000 = 0.500km. at Tailar Dwip of Haildhar Union under Polder No.-63/1B in connection with "Rehabilitation of Coastal Polder No.-62 (Patenga), 63/1A (Anowara), 63/1B (Anowara & Patiya) in Chittagong District" in Upazila- Anowara, District- Chittagong during the year 2016-17 & Strengthening of Bank Protection work along the right bank of Sangu River from KM 1.860 to KM 2.000 during the year 2021-2022. |