As per TDS.
[Note: In this package, salvage material cost Tk. 364215.00 is obtained, which will be deposited by the selected contractor through treasury chalan at Sonali Bank before pay first R/A bill.]
IRIDP-2/MYM/DW-119
a) Improvement of Newgikushmail - Pirgonj road (Ch. 1045 - 2200m); (b) Construction of 6nos 0.625x0.600m Culvert on Same Road at Ch.1370m, 1800m, 1930m, 2080m, 2150m & 2190m under Fulbaria Upazila, District : Mymensingh (Road ID No. 361205034)