View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Zilla Parishad, Mymensingh Procuring Entity Name : Zilla Parishad, Mymensingh
Procuring Entity Code : Procuring Entity District : Mymensingh
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : APP ID : 176334 Tender/Proposal Status :
App ID : 176334 Tender/Proposal ID : 646629
Key Information and Funding Information :
Procurement Method : One stage Two Envelopes Tendering Method (OSTETM) Budget Type : Revenue
Source of Funds : Government
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : 19/e-GP/Rev/2021-22
Construction of 10 stored working women's hostel cum commercial building in front of Zila School Attached to Fulbaria old bus stand in Mymensingh district during the FY/2017-2018.
Category : Construction work; Site preparation work; Works for complete or part construction and civil engineering work; Building installation work; Building completion work; Hire of construction and civil engineering machinery and equipment with operator;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
19-Jan-2022 13:00 Tender/Proposal Document last selling /
downloading Date and Time :
20-Feb-2022 11:00
Pre - Tender/Proposal meeting Start
Date and Time :
19-Jan-2022 14:00 Pre - Tender/Proposal meeting End
Date and Time :
10-Feb-2022 13:00
Tender/Proposal Closing
Date and Time :
20-Feb-2022 15:00 Tender/Proposal Opening
Date and Time :
20-Feb-2022 15:00
Last Date and Time for Tender/Proposal Security
Submission :
20-Feb-2022 13:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As Per TDS.

Brief Description of Works :

19/e-GP/Rev/2021-22 Construction of 10 stored working women's hostel cum commercial building in front of Zila School Attached to Fulbaria old bus stand in Mymensingh district during the FY/2017-2018.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 18-Jul-2022
Tender/Proposal Valid Up to : 20-Jun-2022
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
single 19/e-GP/Rev/2021-22 Construction of 10 stored working women's hostel cum commercial building in front of Zila School Attached to Fulbaria old bus stand in Mymensingh district during the FY/2017-2018. In front of Mymensingh Zila School 5500000 01-Jun-2022 30-May-2024
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Lira Tarafder Designation of Official Inviting Tender/Proposal : Chief Executive Officer
Address of Official Inviting Tender/Proposal :
Address: Gongadas Guha Road, Sadar, Mymensingh.
City: Mymensingh
Thana: Mymensingh Sadar
District: Mymensingh - 2200
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 091-65864
Fax No: 091-66081
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Missing of BOQ Electrical Item

Field Name Old Value New Value
PCC--A. General--

The Start Date shall be  [insert date ]

[it is the last date when the Contractor shall commence execution of  the Works under the Contract reasonably immediately after the Commencement Date; refer to GCC  Clause 40]
 

The Start Date shall within 7 (seven) days from the date of signing of contract

PCC--A. General--

The Works consist of

[state brief summary, including relationship to other Contracts under the Project]

The Works consist of 19/e-GP/Rev/2021-22 Construction of 10 stored working women's hostel cum commercial building in front of Zila School Attached to Fulbaria old bus stand in Mymensingh district during the FY/2017-2018.

PCC--A. General--

The PE is
[Name, address, and name of authorized representative]

The Development Partner is [Name of the DP]

The Procuring Entity is Chief Executive officer, Zila Parishad, Mymensingh.


The Development Partner is : Not Applicable

PCC--A. General--

The PE is
[Name, address, and name of authorized representative]
 

The Procuring Entity is Chief Executive officer, Zila Parishad, Mymensingh.

PCC--A. General--

The original Contract price is [insert the amount in the NOA]

The original Contract price is the same as total quoted price at BOQ.

PCC--A. General--

The Contractor is
[Name, address, and name of authorized representative]
 

The Contractor is(This Clause will be filled up at the time of contract signing)
[Name, address, and name of authorized representative]

PCC--A. General--

The Project Manager is
[Name, address, and name of authorized representative]

 


 

The Project Manager is Assistant Engineer, Zila Parishad, Mymensingh.

PCC--A. General--

The Site is located at [location] and is defined in drawings No: 
[insert numbers]
 

The Site is located at [location] and is defined in drawings No: None

PCC--A. General--

Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s);

[state date or dates  of possession of site] 
 

Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s); within 7 (seven) days from the signing of the contract agreement

PCC--A. General--

Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;

[insert name(s)]
 

Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
1. Project Manager (1 No.), B.Sc. Engineer (Civil)
2. Deputy Project Engineer (1 No.), B.Sc. Engineer (Civil)
3. BNBC Code-2020 & natural disasters expertise (1 No.), B.Sc. Engineer
4. Material & Quality Control Engineer (2 No.), B.Sc. Engineer (Civil)
5. Site Engineer (2 Nos), B.Sc.Engineer/Diploma Engineer
6. Supervisor (2 Nos), B.Sc./Diploma Engineer
7. Security supervisor (1 No.), B.Sc
8. Safety Inspector (2 Nos), B. Sc
9. Surveyor (1 No), Diploma in Survey
10. Plumber (2 Nos), HSC/Vocational

PCC--A. General--

The Sectional Completion Dates are:

[state part of the works and the corresponding dates, if applicable]
 

The Sectional Completion Dates are: All section of the work have to be completed 730 days from the Commencement of work

PCC--A. General--

Nominated Subcontractor(s)  named below;

____[insert name(s)]___________________________________________
shall be entitled to execute the following specific components of the Works

[state none ,if not applicable]
 

Nominated Subcontractor(s) : Not Applicable

PCC--A. General--

The  Contractual matters between the PE and the Contractor shall be decided by

[state only  if other than the Project Manager]
 

The Contractual matters between the PE and the Contractor shall be decided by Chairman, Zila Parishad.

PCC--A. General--

The PE’s address for the purpose of communications under this contract is :
Contact person:
Address:
Tel:
Fax:
e-mail address:


The Contractor’s address for the purpose of communications under this contract is :
Contact person:
Address:
Tel:
Fax:
e-mail address:

The PE’s is Chief Executive officer, Zila Parishad, Mymensingh.


The Contractor’s address for the purpose of communications under this contract is :
Contact person:
Address:
Tel:
Fax:
e-mail address:

PCC--A. General--

The minimum insurance cover shall be:

(a)

The maximum deductible for insurance of the Works and of Plant and Materials is Tk [state amount]


[the Contractor shall provide this amount at the time of Contract signing].
 

(b)

The minimum cover for insurance of the Works and of Plant and Materials in respect of the Contractor’s faulty design is Tk [state amount].


[the amount could be 110% of the value of the works, plant and materials that may be lost in a worst case scenario].
 

(c)

The maximum deductible for insurance of Equipment is Tk [state amount].


[the Contractor shall provide this amount at the time of Contract signing].
 

(d)

The minimum cover for loss or damage to Equipment is Tk [state amount].


[the amount could be 110% of the replacement value of the equipment]
 

(e)

The maximum deductible for insurance of other property is Tk [state amount].


[the Contractor shall state this amount at the time of Contract signing].
 

(f)

The minimum cover for insurance of other property is Tk [state amount].


[it is the responsibility of the Contractor to obtain adequate insurance cover for such risks – recommended value 10% of contract price].
 

(g)

The minimum cover for personal injury or death insurance:


(i) for the Contractor’s employees is as per the law and common practice in Bangladesh.


(ii) and for third parties is as per the law and common practice in Bangladesh.
 

i) Insurance shall be done from Sadharan Bima Corporation at the Contractor's own cost. In this respect, Contract price shall be considerd to be inclusive of cost of premium for Insurance.

ii) The minimum insurance cover shall be:

The minimum insurance cover shall be:
(a) The maximum deductible for insurance of the Works and of Plant and Materials is amount could be 10 % at of the sum insured[the Contractor shall state this amount at the time of Contract signing].
(b) The minimum cover for insurance of the Works and of Plant and Materials in respect of the Contractor’s faulty design is Tk 110% of the contract Amount.
(c) The maximum deductible for insurance of Equipment is amount could be 10% at of the sum insured [the Contractor shall state this amount at the time of Contract signing].
(d) The minimum cover for loss or damage to Equipment is amount could be 110% of the replacement value of the equipment.
(e) The maximum deductible for insurance of other property is amount could be 10% of sum insured [the Contractor shall state this amount at the time of Contract signing]
(f) The maximum deductible for insurance of other property is amount could be 10% of sum insured [the Contractor shall state this amount at the time of Contract signing]
(g)

The minimum cover for personal injury or death insurance:

(i) for the Contractor’s employees is as per the law and common practice in Bangladesh.
(ii) and for third parties is as per the law and common practice in Bangladesh.

PCC--A. General--

Other documents forming part of the Contract are; 

 

[list other documents viz. Schedule of other contractors, Schedule of Key Personnel, Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]

Other documents forming part of the Contract are;

i. The Schedule of Key Personnel;

ii.Work Program;

iii. Joint Venture Agreement ( if applicable);

iv.Joint Venture Information Sheet (if applicable);

v. Insurance.

PCC--A. General--

Materials, Equipments Plants and supplies shall not have their origin in  the following countries:

[state countries, if applicable]
 

Materials, Equipments Plants and supplies shall not have their origin in the following countries: ISRAEL

PCC--A. General--

A Contractor or a Subcontractor  that is a national of, or registered in, the following countries are not eligible:

[state countries, if applicable]
 

A Contractor or a Subcontractor that is a national of, or registered in, the following countries are not eligible: Israel

PCC--B. Time Control--

Commencement Date of Works shall be as follows;

[insert different commencement dates for different parts of the Works, if deemed appropriate]
 

Commencement Date of Works shall be as follows; 7 days from the signing of contract

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.

[usually fifteen (15) days]
 

The period between Programme updates is 30 days.

PCC--B. Time Control--

The period between Programme updates is [state interval]

[usually bi-monthly or quarterly depending on the nature of the Works]
 

The period between Programme updates is bi-monthly

PCC--B. Time Control--

The amount to be withheld for late submission of an updated Programme is [state amount].

The amount to be withheld for late submission of an updated Programme is 0.5% of the next payment certificate.

PCC--C. Quality Control--

The Defects Liability Period is [state months]

[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is twelve (12) months.

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:


[list events or state none ]
 

The following additional events shall also be the Compensation Events: none

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.


[state “none’ if not applicable. If applicable then the proportion of Retention Money shall be equal to the percentage-shortfall of ten (10) percent of Performance Security determined at the time of signing the Contract. Again in case of unbalanced Tender or because of front loading, provision for Retention Money shall not be applicable]
 

The proportion of payments to be retained is10 percent.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of its Contract price per day of delay]
Guide to application of GCC Sub Clause 76.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x Px n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay
n = No of days of delay for completion of works under the Contract]

 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.


[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]

 

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of its Contract price per day of delay]
Guide to application of GCC Sub Clause 76.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x Px n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay
n = No of days of delay for completion of works under the Contract]

 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 percent of the final Contract price of the whole of the Works.

PCC--D. Cost Control--

The Bonus for the whole of the Works is [insert percentage] percent of the final Contract price per day.

The maximum amount of Bonus for the whole of the Works is [insert percentage] percent of the final Contract price.

[if early completion would provide benefits to the PE, this clause should remain, otherwise state “Not Applicable”. The bonus is usually numerically equal to the Liquidated Damages]
 

The Bonus for the whole of the Works is [insert percentage] percent of the final Contract price per day : Not Applicable

The maximum amount of Bonus for the whole of the Works is [insert ≤ ten (10)] percent of the final Contract Price : Not Applicable

PCC--D. Cost Control--

The Advance Payment shall be Tk [insert amount] and shall be paid to the Contractor not later than [insert date].

[for 100 percent GoB funded procurement, advance payments are not recommended unless otherwise specifically decided by the Government. An advance payment, if admissible, shall be made for mobilisation, considering the nature of the works. The recommended maximum advance payment is ten (10) percent of the original Contract price against an unconditional Bank Guarantee (Form e-PW3-10.) On the contrary, advance payments may be applicable for procurements under aided projects]
 

The Advance Payment shall be Tk [insert amount] and shall be paid to the Contractor not later than [insert date].Not Applicable

PCC--D. Cost Control--

The percentage for adjustment of Provisional Sums is

____% (_________percent)
[state none, if not applicable. Usually covers the VAT, profit and overhead costs]
 

The percentage for adjustment of Provisional Sums is : None

PCC--E. Completion of the Contract--

The date by which “as-built” drawings are required is [insert date]

 

The date by which operating and maintenance manuals are required is [insert date]

The date by which “as-built” drawings are required is Not Applicable

PCC--E. Completion of the Contract--

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]

[usually a very nominal amount]
 

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk. maximum 0.01% ( zero one percent) of the final amount.

PCC--F. Termination and Settlement of Disputes--

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is 20 percent.

PCC--G. Claims, Disputes and Arbitration--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]

The arbitration shall be conducted in the place mentioned below;
Chairman, Zila Parishad, Mymensingh.

PCC--G. Claims, Disputes and Arbitration--

The Adjudicator jointly appointed by the parties is:
Name:
Address:
Tel No:
Fax No:
e-mail address:

 

In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. 

The arbitration shall be conducted in the place mentioned below;
Chairman, Zila Parishad, Mymensingh.

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

The minimum capacity shall be:16,00,00,000 (Sixteen crore) taka
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.

TDS/PDS--C. Qualification Criteria--

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

 

No Position Total Works Experience (years) In Similar
Works
Experience
(years)
 
1 Project Manager,B.Sc. Engrr.(Civil), 2(Two) Nos 8 Years 5 Years
2 Site Engineer ,Diploma in civil Enggr. 5 Years 4 Years
3 Site Engineer ,Diploma in Electrical/Mechanical Enggr. 5 Years 4 Years
4 Quality Control Engineer 5 Years 4 Years
5 Site Manager, HSC Passed 5 Years 4 Years
6 Electrician,Having A/B/C Licence 5 Years 4 Years

 

 

 

 


 

 

 

 

[ qualification of an alternative Construction Project Manager may also be requested]
[ for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package]
 

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

No Position Total Works Experience (years) In Similar
Works
Experience
(years)
 
1 Project Manager (1 No.) , B.Sc. Engineer (Civil) 20 Years 15 Years
2 Deputy Project Engineer (1 No.), B.Sc. Engineer (Civil) 15 Years 10 Years
3 BNBC Code-2020 & natural disasters expertise (1 No.), B.Sc. Engineer 15 Years 10 Years
4 Material & Quality Control Engineer (2 No.), B.Sc. Engineer (Civil) 15 Years 10 Years
5 Site Engineer(2 Nos), B.Sc.Engineer/ Diploma Engineer 10 Years 8 Years
6 Supervisor (4 Nos), B.Sc./ Diploma Engineer 10 Years 8 Years
7 Security supervisor (1 No.), B.Sc 8 Years 6 Years
8 Safety Inspector (2 Nos), B. Sc 8 Years 6 Years
9 Surveyor (1 No), Diploma in Survey 8 Years 6 Years
10 Plumber (2 Nos), HSC/Vocational 8 Years 5 Years

 

 

 

 


 

 

 

 

 

TDS/PDS--C. Qualification Criteria--

Tenderer shall own or have proven access to hire or lease of the major construction  equipments, in full working order as follows :

 

No Equipment Type and Characteristics Minimum Number
Required
 
1 Mixter Machine As per Requirement
2 Vibrator Machine As per Requirement
3 Steel Shutter for cloumn , Beam & Slab Etc. As per Requirement
4 Pump, Motor And EM Equipments As per Requirement
5 others equipment As per Requirement
     

 

 [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary  for each lot in the package, subject to the nature of the control required over each package]

Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
1. Dump Truck - 6 nos
2. Excavator, Backhoes and Pay loader - 3 nos
3. Pilling Equipment - 2 set
4. Tower cranes - 1 set
5. Scaffolding - 200 sqm
6. Rebar cutting & Bending Machine - 4 set
7. Steel Shutter - 400 sqm
8. Water Pumps - 4 nos
9. Generators - 2 set
10. Survey Equipment - 1 set
11. Laboratory Testing Equipment Complete set-2 set
12. Safety tools/Equipment - As required
13. Concrete vibrator - 8 nos
14. Automatic Concrete Mixer Machine with Hopper-2 set
15. Hydraulic Swing HOIST - 1 set
 

TDS/PDS--D. Tender Preparation--

The Tenderer shall submit with its Tender the following additional documents:


[in case of purchase of capital equipment by the Contractor as part of the overall Contract, a Performance Statement of the capital equipment in Bangladesh may be necessary and may be requested. if no other documents are required then specify “none”]

 

The Tenderer shall submit with its Tender the following additional documents:
1. National ID
2. JV Agreement
3. Business Address
4. Document in support of financial capability.
5. Up to date Tax clearence certificate.
6. Valid Trade License
7. substantiated by the year of registration/constitution/licensing copy
8. Safety & security plan of working Area
9. Litigation History
10. Information on Annual Construction Turnover Form (e-PW3-2) Part - 4:-

Sl. No Finencial Year Name of work for which payment recived Name of PE from which payment recived Name of Bank where money deposited by PE Date of Payment Amount of payment recived Remarks
1 2 3 4 5 6 7 8
               
TDS/PDS--D. Tender Preparation--

The prices quoted by the Tenderer shall be fixed for the duration of the Contract.
OR
The prices quoted by the Tenderer shall be adjustable as follows:

Iif prices shall be adjustable, the methodology for adjustment should be specified]
 

The prices quoted by the Tenderer shall be fixed for the duration of the Contract.

TDS/PDS--E. Tender e-Submission--

The deadline for lodgement of e-Tenders is [state time, and identify a.m or p.m, i.e 10.30 a.m]


[state date i,e. 15 june,2011 ].
 

The deadline for lodgement of e-Tenders is As per tender Notice

TDS/PDS--G. Contract Award--

The amount of Performance Security shall be [state percentage] percent of the Contract Price.

[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ]
 

The amount of Performance Security shall be10 percent of the Contract Price.

 