Qualification Criteria : As per TDS
The Intended Completion Date for the whole of the Works shall be 6.00 month after starting the work. [ Intended completeion date of the work may be 12 (twelve) Month if project duration increased ]
GDIRIIP/Tungi/VR-SR/21-22/83 Construction of 25.00m Long RCC Variable Depth Girder Bridge on Shalukhar UZR Vennabari GPS Road at Ch. 1120m (Road ID No: 335914036) under Tungipara Upazila, District: Gopalganj.