Qualification Criteria : As per TDS
The Intended Completion Date for the whole of the Works shall be 6.00 month after starting the work. [ Intended completeion date of the work may be 12 (twelve) Month if project duration increased ]
GDIRIIP/Kotali/SP/VR-SR/21-22/218 Construction of 20.00m Long RCC Variable Depth Girder Bridge on SrifalbariShilta Mondir to Jotiarbari Road at Ch. 4020m ( Road ID No: 335515485) under Kotwalipara Upazila, District Gopalganj