Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction in Bill Of Quantities (BOQ) Correction in Official Estimate Correction in Name Of Work |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 06/02/2022 16:30 | 10/02/2022 16:30 |
| Eligibility of Consultant | As per Tender Data Sheet (TDS). 1. Certificate having work completion date before 23/01/2017 will not be considered as similar works certificate during evaluation. 2. Payment certificates having payment before 23/01/2017 will not be considered in calculation of AACT during evaluation. 3. The certificates submitted by the tenderer in proof of Specific Experience / AACT must be as per the standard format attached/uploaded in Particular Specification Section. Certificate other than the specified format must contain the information like (particulars of PE in/c e-mail & contact no, business shares in case of JV, time extension, liquidity damage, contract & final bill amount etc.). A tenderer failing to submit that will be considered as “Non responsive” during evaluation. 4. No Experience Certificat, only Payment Certificate will be considered in Turn-over & Tender Capacity calculation during evaluation to avoid error in calculation. 5. In the case of liquid asset, certificate with statement from bank should be submitted and in the case of credit facilities, it should be sanctioned and both must be issued not earlier than the date of publication of IFT Notice in the e-GP Website. 6. In case of tender capacity tenderer must submit the data/information regarding works in hand and committed works as per Departmental prescribed format attached/uploaded in Particular Specification Section as "Form-B" . 7. If a tenderer wants to qualify more than one package, each package shall be qualified separately for Liquid Asset & Tender Capacity. |
As per Tender Data Sheet (TDS). 1. Certificate having work completion date before 23/01/2017 will not be considered as similar works certificate during evaluation. 2. Payment certificates having payment before 23/01/2017 will not be considered in calculation of AACT during evaluation. 3. The certificates submitted by the tenderer in proof of Specific Experience / AACT must be as per the standard format attached/uploaded in Particular Specification Section. Certificate other than the specified format must contain the information like (particulars of PE in/c e-mail & contact no, business shares in case of JV, time extension, liquidity damage, contract & final bill amount etc.). A tenderer failing to submit that will be considered as “Non responsive” during evaluation. 4. No Experience Certificat, only Payment Certificate will be considered in Turn-over & Tender Capacity calculation during evaluation to avoid error in calculation. 5. In the case of liquid asset, certificate with statement from bank should be submitted and in the case of credit facilities, it should be sanctioned and both must be issued not earlier than the date of publication of IFT Notice in the e-GP Website. 6. In case of tender capacity tenderer must submit the data/information regarding works in hand and committed works as per Departmental prescribed format attached/uploaded in Particular Specification Section as "Form-B" . 7. If a tenderer wants to qualify more than one package, each package shall be qualified separately for Liquid Asset & Tender Capacity. |
| Opening Date & Time | 07/02/2022 12:00 | 13/02/2022 12:00 |
| Last date & time for Tender/Proposal Security Submission | 06/02/2022 17:00 | 10/02/2022 17:00 |
| Closing Date & Time | 07/02/2022 12:00 | 13/02/2022 12:00 |
| TDS/PDS--C. Qualification Criteria-- |
The required average annual construction turnover shall be greater than Tk 9,00,000/- (In word: Taka Nine Lac) over the last 5 (Five) years counting backward from the date of publication of IFT in the e-GP website. A tenderer failing to submit that will be considered as “Non-responsive” during evaluation. Only Payment Certificate will be considered in Turn-over & Tender Capacity calculation during evaluation. No Specific Experience Certificate will be considered in Turn-over calculation. |
The required average annual construction turnover shall be greater than Tk 11,00,000/- (In word: Taka Eleven Lac) over the last 5 (Five) years counting backward from the date of publication of IFT in the e-GP website. A tenderer failing to submit that will be considered as “Non-responsive” during evaluation. Only Payment Certificate will be considered in Turn-over & Tender Capacity calculation during evaluation. No Specific Experience Certificate will be considered in Turn-over calculation. |
| TDS/PDS--C. Qualification Criteria-- |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3,00,000/- (In word: Taka Three Lac Only). |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3,50,000/- (In word: Taka Three Lac Fifty Thousand Only). |
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be: Tk 6,00,000/- (In word: Taka Six Lac Only).
In case of tender capacity tenderer must submit the data/information regarding works in hand as per Departmental prescribed format attached/uploaded in Particular Specification Sectiont as "Form-B" . |
The minimum capacity shall be: Tk 9,00,000/- (In word: Taka Nine Lac Only).
In case of tender capacity tenderer must submit the data/information regarding works in hand as per Departmental prescribed format attached/uploaded in Particular Specification Sectiont as "Form-B" . |
| TDS/PDS--C. Qualification Criteria-- |
A satisfactory completion of similar works (Installation of Tubewell i.e. DTW/STW/Tw with Submerssible Pump) of at least Tk 5,00,000/- (In word: Taka Five Lac Only) under 1 (one) of contract(s) over a period of 5 (Five) years counting backward from the date of publication of IFT in the e-GP website shall be required. A tenderer failing to submit that will be considered as “Non responsive” during evaluation. |
A satisfactory completion of similar works (Installation of Tubewell i.e. DTW/STW/Tw with Submerssible Pump) of at least Tk 7,00,000/- (In word: Taka Seven Lac Only) under 1 (one) of contract(s) over a period of 5 (Five) years counting backward from the date of publication of IFT in the e-GP website shall be required. A tenderer failing to submit that will be considered as “Non responsive” during evaluation. |
| Brief Description of Goods,Works or Service | Installation of 8 nos. Tube-well [6 nos. Deep Tube-well (DTW) (100X38) with Submersible Pump & 2 nos. Shallow Tube-well (STW) with # 6 Hand Pump] for houses constructed for homeless people in Mujib Birth Centenary at different places of Narsingdi District under Revenue Budget of Department of Public Health Engineering (DPHE) for the FY:2021-2022. |
Installation of 9 nos. Tube-well [6 nos. Deep Tube-well (DTW) (100X38) with Submersible Pump & 3 nos. TARA System (Extractable) Shallow Tube-well (75X38) with # 6 Hand Pump] for houses constructed for homeless people in Mujib Birth Centenary at different places of Narsingdi District under Revenue Budget of Department of Public Health Engineering (DPHE) for the FY:2021-2022. |