View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction of credit line |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. It is to be noted that quoting of boring rate should be increased proportionally according to the depth of well otherwise the tender would be declared non responsive without satisfactory clarification. 2. For abnormal or unjustified price quotation the tenderer may lead to be declared ineligible as per section 98/23/a of PPR 2008. 3.Without containing PE's Memo & Name Work Order Amount,completed amount ,Completion Date, Official ref no./memo ,e-Mail(if Possible)Experience Certificate/Payment Certificate will be disregarded for evaluation process. 4. Bank Statement must be within Publishing date of Tender or Credit facility must be in PW3-7 form otherwise the Tender would be consider Non -Responsive. 5.Other condition will remain same as per TD |
1. It is to be noted that quoting of boring rate should be increased proportionally according to the depth of well otherwise the tender would be declared non responsive without satisfactory clarification. 2. For abnormal or unjustified price quotation the tenderer may lead to be declared ineligible as per section 98/23/a of PPR 2008. 3.Without containing PE's Memo & Name Work Order Amount,completed amount ,Completion Date, Official ref no./memo ,e-Mail(if Possible)Experience Certificate/Payment Certificate will be disregarded for evaluation process. 4. Bank Statement must be within Publishing date of Tender or Credit facility must be in PW3-7 form otherwise the Tender would be consider Non -Responsive. 5.Other condition will remain same as per TD |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [5]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [40 lac]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
| Brief Description of Goods,Works or Service | Drilling & Installation of 138 nos Deep Tube Well 100x38mm with Submersible Pump at Nasirnagar Upazila in Brahmanbaria District Under Safe Water Supply Through Out The Country PSWSC. |
Drilling & Installation of 138 nos Deep Tube Well 100x38mm with Submersible Pump at Nasirnagar Upazila in Brahmanbaria District Under Safe Water Supply Through Out The Country PSWSC. |