As per TDS
IRIDP-3/JLK/SDW-15 (a) Improvement of Rampur Jogodispur Govt pry School via Shovod Halder Bari Road from Ch. 00-1000m [SADAR] [Road ID 542405334] [Salvage Cost: 1272596 Taka] (b) Construction of 2nos 6m Bridge at Ch. 235m & Ch. 980m on the same road. (c) Construction of 1no 2x2m Culvert at Ch. 765m on the same road. (d) Construction of 2nos 1.50x1.50m culvert at Ch. 525m & Ch. 933m on the same (e) Improvement of Boukati Bazar Post Office-Nabogram RHD road from Ch. 00-690m [SADAR] [Road ID 542404139] [Salvage Cost: 1460528 Taka] (f) Construction of 1no. 2x2m culvert at Ch. 28m on the same road. (g) Construction of 2no 1.50x1.50m culvert at Ch. 383 & Ch. 630m on the same road.