View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Water Resources Division :
Organization : Bangladesh Water Development Board (BWDB) Procuring Entity Name : Rangpur O&M Division
Procuring Entity Code : Procuring Entity District : Rangpur
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : T-7/1702, Dated:23-01-2022 Tender/Proposal Status :
App ID : 182752 Tender/Proposal ID : 653427
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224346700 Project Name : Bank protection work & Re-excavation of Small River, Khal, Water Reservior and Removing water logging in Upazila Pirgong under District Rangpur
Tender/Proposal Package No. and Description : Protective/ Kor-08
550 m River Bank Protection work along theRight bank of Korotoya river at Kuyetpur Hamidpur in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.
Category : Construction work for water projects; Works for complete or part construction and civil engineering work;
Scheduled Tender/Proposal Publication
Date and Time :
27-Jan-2022 16:00 Tender/Proposal Document last selling /
downloading Date and Time :
06-Mar-2022 12:00
Pre - Tender/Proposal meeting Start
Date and Time :
27-Jan-2022 16:30 Pre - Tender/Proposal meeting End
Date and Time :
30-Jan-2022 16:00
Tender/Proposal Closing
Date and Time :
06-Mar-2022 14:40 Tender/Proposal Opening
Date and Time :
06-Mar-2022 14:40
Last Date and Time for Tender/Proposal Security
Submission :
06-Mar-2022 14:10    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

Any individual(s) firms who fulfill the qualification(s) criteria of each package as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents.The Tenderers are requested to read carefully the instructions in section-2 (TDS) ; section-4 (PCC) & Section-8 (Particular Specifications) & strictly follow the instructions.

Special Instruction:

  • Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
  • Work certificate which is issued by the PE ( Procuring Entity) and executed by public fund will only be considered as an qualification criteria.
  • The tenderer has to arrange land or other establishment by his own for execution of work . Test fee for the required test (as per direction of engineer in charge) conducted during / after the work to be paid by the contractor.
  •  Block or geobag rejected by the BWDB, Taskforce committee shall be dumped or placed without any additional payment.
  • The work may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained.
  • Field office quality control as well as quality control regulations under Chief Engineer, Monitoring office must be followed by the contractor. Taskforce measurement report, uploaded BWDB specification, Approved Design shall be followed by the contractor.
  • The uploaded documents by the contractor must be clearly readable, any misleading information provided by the contractor represent his/her disqualification.
  • In case of similar work experience certificate consisting different component of work, the part value of similar work (for example-earth work, RCC work etc.) must be clearly mentioned, otherwise the certificate will not be considered. 
Brief Description of Works :

550 m River Bank Protection work along theRight bank of Korotoya river at Kuyetpur Hamidpur in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 02-Jul-2022
Tender/Proposal Valid Up to : 04-Jun-2022
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
Protective/ Kor-08 550 m River Bank Protection work along theRight bank of Korotoya river at Kuyetpur Hamidpur in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur. Pirgonj, Rangpur 2700000 20-Mar-2022 28-Jun-2023
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Ahsan Habib Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Alamnagar Rangpur
City: Rangpur City
Thana: Rangpur Sadar
District: Rangpur - 5402
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0521-63509
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

notice

Field Name Old Value New Value
Document last selling date & time 28/02/2022 16:00 06/03/2022 12:00
Eligibility of Consultant

Any individual(s) firms who fulfill the qualification(s) criteria of each package as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents.The Tenderers are requested to read carefully the instructions in section-2 (TDS) ; section-4 (PCC) & Section-8 (Particular Specifications) & strictly follow the instructions.

Special Instruction:

  • Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
  • Work certificate which is issued by the PE ( Procuring Entity) and executed by public fund will only be considered as an qualification criteria.
  • The tenderer has to arrange land or other establishment by his own for execution of work . Test fee for the required test (as per direction of engineer in charge) conducted during / after the work to be paid by the contractor.
  •  Block or geobag rejected by the BWDB, Taskforce committee shall be dumped or placed without any additional payment.
  • The work may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained.
  • Field office quality control as well as quality control regulations under Chief Engineer, Monitoring office must be followed by the contractor. Taskforce measurement report, uploaded BWDB specification, Approved Design shall be followed by the contractor.
  • The uploaded documents by the contractor must be clearly readable, any misleading information provided by the contractor represent his/her disqualification.
  • In case of similar work experience certificate consisting different component of work, the part value of similar work (for example-earth work, RCC work etc.) must be clearly mentioned, otherwise the certificate will not be considered. 

Any individual(s) firms who fulfill the qualification(s) criteria of each package as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents.The Tenderers are requested to read carefully the instructions in section-2 (TDS) ; section-4 (PCC) & Section-8 (Particular Specifications) & strictly follow the instructions.

Special Instruction:

  • Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
  • Work certificate which is issued by the PE ( Procuring Entity) and executed by public fund will only be considered as an qualification criteria.
  • The tenderer has to arrange land or other establishment by his own for execution of work . Test fee for the required test (as per direction of engineer in charge) conducted during / after the work to be paid by the contractor.
  •  Block or geobag rejected by the BWDB, Taskforce committee shall be dumped or placed without any additional payment.
  • The work may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained.
  • Field office quality control as well as quality control regulations under Chief Engineer, Monitoring office must be followed by the contractor. Taskforce measurement report, uploaded BWDB specification, Approved Design shall be followed by the contractor.
  • The uploaded documents by the contractor must be clearly readable, any misleading information provided by the contractor represent his/her disqualification.
  • In case of similar work experience certificate consisting different component of work, the part value of similar work (for example-earth work, RCC work etc.) must be clearly mentioned, otherwise the certificate will not be considered. 
Opening Date & Time 01/03/2022 14:40 06/03/2022 14:40
Last date & time for Tender/Proposal Security Submission 01/02/2022 14:10 06/03/2022 14:10
Closing Date & Time 01/03/2022 14:40 06/03/2022 14:40
 