Qualification Criteria : As per TDS
The Intended Completion Date for the whole of the Works shall be 6.00 month after starting the work. [ Intended completeion date of the work may be 12 (twelve) Month if project duration increased ]
GDIRIIP/Tungi/UZR-SR/21-22/84 Construction of 30.00m Long RCC Variable Depth Girder Bridge on Kushli Hat GC-Dharabasail Road via Mittradanga, Sonakhali Road at Ch. 12688m (Road ID No: 335912007) under Tungipara Upazila, District: Gopalganj.