AS per TDS
Also Carefully See Section No. 2, Sub Section No. 4 Name Of Sub Section (D. Tender Preparation)
If necessary the bidder must have to arrange at least two weeks training program after receiving the NOA for showing the performance of the kit in the quality control laboratory, Khulna.
If necessary the tenderer will have to validate the kit by the manufacturer’s expert during evaluation period by using tenderer own cost but tenderer must inform the PE on the validation procedure before 25.04.2022.
Procurement of ELISA Kit ( OTC) 06