View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 5
|
|
| Amendment / Corrigendum Text : | Need to amend in descrfiption of BOQ Item No. 7. Please see the BOQ Section and Notice. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 23/03/2022 17:00 | 28/03/2022 17:00 |
| Opening Date & Time | 24/03/2022 15:00 | 29/03/2022 15:00 |
| Last date & time for Tender/Proposal Security Submission | 23/03/2022 17:00 | 28/03/2022 17:00 |
| Closing Date & Time | 24/03/2022 15:00 | 29/03/2022 15:00 |
|
Amendment / Corrigendum No. : 4
|
|
| Amendment / Corrigendum Text : | Need to amend on description of BOQ Item No. 7 & Clarification on TDS Section: ITT Clause 25.1 (K) - 4, 5, 7, 8, 11, 12, 13 & 14. A. Correction on description of BOQ Item No. 7:- Please see the BOQ Section. B. Clarification on TDS Section: ITT Clause 25.1 (K) - 4, 5, 7, 8, 11, 12, 13 & 14 as follows:- "Offered / Proposed" Equipment mentioned in the tender means that the equipment will be Type Tested Assemble (TTA) at the same voltage and current rating will be as same or above in terms of Technical Specification or description in the BOQ items. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 20/03/2022 12:00 | 23/03/2022 17:00 |
| Opening Date & Time | 20/03/2022 15:00 | 24/03/2022 15:00 |
| Last date & time for Tender/Proposal Security Submission | 20/03/2022 12:00 | 23/03/2022 17:00 |
| Closing Date & Time | 20/03/2022 15:00 | 24/03/2022 15:00 |
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Need to clarify on specification for BOQ item no. 7 & 12 (a) |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 13/03/2022 17:00 | 20/03/2022 12:00 |
| Opening Date & Time | 14/03/2022 12:00 | 20/03/2022 15:00 |
| Last date & time for Tender/Proposal Security Submission | 13/03/2022 17:00 | 20/03/2022 12:00 |
| Closing Date & Time | 14/03/2022 12:00 | 20/03/2022 15:00 |
| Amendment / Corrigendum/ Addendum No. : | 3 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Clarification on Specification.pdf | Clarification on specification | 1295206 | ||
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Need to amend some parameters in TDS clausses |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 08/03/2022 17:00 | 13/03/2022 17:00 |
| Opening Date & Time | 09/03/2022 12:00 | 14/03/2022 12:00 |
| Last date & time for Tender/Proposal Security Submission | 08/03/2022 17:00 | 13/03/2022 17:00 |
| Closing Date & Time | 09/03/2022 12:00 | 14/03/2022 12:00 |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [15 (fifteen) ] years.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [1(single)] contract(s) of similar nature(Providing,installation,testing & commissioning of Substation works) complexity and methods/construction technology successfully completed within the last [10] years, each with a value of at least Tk. [ 10,50,00,000.00]. (Above specific experience will be considered only for any Govt./Semi Govt./Autonomous organization)
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [10 (ten) ] years.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [1(single)] contract(s) of similar nature(Providing,installation,testing & commissioning of Substation works) complexity and methods/construction technology successfully completed within the last [10] years, each with a value of at least Tk. [ 10,50,00,000.00]. (Above specific experience will be considered only for any Govt./Semi Govt./Autonomous organization)
|
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents:
3. A declaration to the effect that the bidder has got the scope of work fully clarifled. 4. Tenderer shall have to submit manufacturers Certificate to the effect that the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender. 5.The bidder must mention the year of manufacture of the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022. 6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender. 7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim. 8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim. 9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board. 10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years. 11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 12. Manufacturer must have at least 10(ten) years experience in manufaturing similar equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim. 13. HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender. 14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender. 15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.
16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
“Manufacturer’s Authorisation Letter”
The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes. The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.
23. Consent letter to carry out Training as mentioned below: a. Factory Training Place: Manufacturing plant/factory The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.
b. Local Training at Site (10 Persons)
Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder. 24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge) 25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender. 26. The bidder must have to follow the instructions or requirements attached in particular specification documents. a) Conceptual drawings b) Required installation manual comprising i)Technical data sheet which is practically incorporated in the system. ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information. 27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this. 28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.
|
The Tenderer shall submit with its Tender the following additional documents:
3. A declaration to the effect that the bidder has got the scope of work fully clarifled. 4. Tenderer shall have to submit manufacturers Certificate to the effect that the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender. 5.The bidder must mention the year of manufacture of the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022. 6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender. 7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim. 8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for offered 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim. 9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board. 10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years. 11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 12. Manufacturer must have at least 10(ten) years experience in manufaturing similar/offered equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim. 13. Offered HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender. 14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender. 15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.
16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
“Manufacturer’s Authorisation Letter”
The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes. The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.
23. Consent letter to carry out Training as mentioned below: a. Factory Training Place: Manufacturing plant/factory The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.
b. Local Training at Site (10 Persons)
Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder. 24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge) 25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender. 26. The bidder must have to follow the instructions or requirements attached in particular specification documents. a) Conceptual drawings b) Required installation manual comprising i)Technical data sheet which is practically incorporated in the system. ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information. 27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this. 28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.
|
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents:
3. A declaration to the effect that the bidder has got the scope of work fully clarifled. 4. Tenderer shall have to submit manufacturers Certificate to the effect that the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender. 5.The bidder must mention the year of manufacture of the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022. 6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender. 7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim. 8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim. 9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board. 10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years. 11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 12. Manufacturer must have at least 10(ten) years experience in manufaturing similar equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim. 13. HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender. 14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender. 15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.
16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
“Manufacturer’s Authorisation Letter”
The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes. The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.
23. Consent letter to carry out Training as mentioned below: a. Factory Training Place: Manufacturing plant/factory The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.
b. Local Training at Site (10 Persons)
Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder. 24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge) 25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender. 26. The bidder must have to follow the instructions or requirements attached in particular specification documents. a) Conceptual drawings b) Required installation manual comprising i)Technical data sheet which is practically incorporated in the system. ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information. 27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this. 28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.
|
The Tenderer shall submit with its Tender the following additional documents:
3. A declaration to the effect that the bidder has got the scope of work fully clarifled. 4. Tenderer shall have to submit manufacturers Certificate to the effect that the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender. 5.The bidder must mention the year of manufacture of the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022. 6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender. 7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim. 8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for offered 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim. 9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board. 10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years. 11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 12. Manufacturer must have at least 10(ten) years experience in manufaturing similar/offered equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim. 13. Offered HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender. 14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender. 15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.
16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
“Manufacturer’s Authorisation Letter”
The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes. The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.
23. Consent letter to carry out Training as mentioned below: a. Factory Training Place: Manufacturing plant/factory The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.
b. Local Training at Site (10 Persons)
Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder. 24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge) 25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender. 26. The bidder must have to follow the instructions or requirements attached in particular specification documents. a) Conceptual drawings b) Required installation manual comprising i)Technical data sheet which is practically incorporated in the system. ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information. 27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this. 28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.
|
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Need to amend some parameters in TDS & PCC Clauses. |
| Field Name | Old Value | New Value |
|---|---|---|
| Completion Date(Lot No : 1) | 11/09/2022 | 02/04/2023 |
| Eligibility of Consultant | As per Tender Documents. |
As per Tender Documents. |
| PCC--B. Time Control-- | Commencement Date of Works shall be as follows;Within 30 days after agreement sign(Total Execution time will be 180 days)
[insert different commencement dates for different parts of the Works, if deemed appropriate] |
Commencement Date of Works shall be as follows;Within 30 days after agreement sign (Total duration of the works will be 36 months including defect liability period)
[insert different commencement dates for different parts of the Works, if deemed appropriate] |
| Start Date(Lot No : 1) | 15/03/2022 | 03/04/2022 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [22,00,00,000.00] over the last [5(five)] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [6,00,00,000.00]
Liquid assets certificate is accepted only in the following format: Letter of Commitment for Bank’s undertaking for Line of Credit
Invitation for Tender No:
To:
Signature Signature |
The required average annual construction turnover shall be greater than Tk [6,75,00,000.00] over the last [5 (Five)] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [6,00,00,000.00]
Liquid assets certificate is accepted only in the following format: Letter of Commitment for Bank’s undertaking for Line of Credit
Invitation for Tender No:
To:
Signature Signature |
| Brief Description of Goods,Works or Service | Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport. |
Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport. |