View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Civil Aviation & Tourism Division :
Organization : Civil Aviation Authority of Bangladesh Procuring Entity Name : Office of the Superintending Engineer, EM Circle-Project
Procuring Entity Code : Procuring Entity District : Dhaka
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 30.31.0000.401.14.024.22.147 Tender/Proposal Status :
App ID : 180289 Tender/Proposal ID : 656574
Key Information and Funding Information :
Procurement Method : One stage Two Envelopes Tendering Method (OSTETM) Budget Type : Own Fund
Source of Funds : Own Fund
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : WD-3./Code-100/CoxsA/2021-2022
Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport.
Category : Transformers; Electric motors, generators and transformers; Electricity distribution and control apparatus; Electrical apparatus for switching or protecting electrical circuits; Electrical circuit components; Parts of electricity distribution or control apparatus; Insulated wire and cable; Electrical machinery, apparatus, equipment and consumables; Mains; Power distribution cables; Coaxial cable; Insulated cable accessories; Electric conductors for data and control purposes; Accumulators, primary cells and primary batteries; Primary cells; Primary batteries; Electric accumulators; Electronic, electromechanical and electrotechnical supplies; Electrical machinery, apparatus, equipment and consumables; Electronic equipment; Electromechanical equipment; Electrotechnical equipment;
Scheduled Tender/Proposal Publication
Date and Time :
07-Feb-2022 17:00 Tender/Proposal Document last selling /
downloading Date and Time :
28-Mar-2022 17:00
Pre - Tender/Proposal meeting Start
Date and Time :
08-Feb-2022 10:00 Pre - Tender/Proposal meeting End
Date and Time :
10-Feb-2022 17:00
Tender/Proposal Closing
Date and Time :
29-Mar-2022 15:00 Tender/Proposal Opening
Date and Time :
29-Mar-2022 15:00
Last Date and Time for Tender/Proposal Security
Submission :
28-Mar-2022 17:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per Tender Documents.

Brief Description of Works :

Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 24-Aug-2022
Tender/Proposal Valid Up to : 27-Jul-2022
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport. Coxs Bazar Airport 5500000 03-Apr-2022 02-Apr-2023
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Shuvasheesh Barua Designation of Official Inviting Tender/Proposal : Superintending Engineer (E/M)
Address of Official Inviting Tender/Proposal :
Address: Civil Aviation Authority of Bangladesh, Kurmitola, Dhaka-1229.
City: Dhaka
Thana: Airport
District: Dhaka - 1229
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 02-8901881
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  5 
Amendment / Corrigendum Text :

Need to amend in descrfiption of BOQ Item No. 7.

Please see the BOQ Section and Notice.

Field Name Old Value New Value
Document last selling date & time 23/03/2022 17:00 28/03/2022 17:00
Opening Date & Time 24/03/2022 15:00 29/03/2022 15:00
Last date & time for Tender/Proposal Security Submission 23/03/2022 17:00 28/03/2022 17:00
Closing Date & Time 24/03/2022 15:00 29/03/2022 15:00
 Amendment / Corrigendum No. :  4 
Amendment / Corrigendum Text :

Need to amend on description of BOQ Item No. 7 & Clarification on TDS Section: ITT Clause 25.1 (K) - 4, 5, 7, 8, 11, 12, 13 & 14.

A. Correction on description of BOQ Item No. 7:- Please see the BOQ Section.

B. Clarification on TDS Section: ITT Clause 25.1 (K) - 4, 5, 7, 8, 11, 12, 13 & 14 as follows:-

"Offered / Proposed" Equipment mentioned in the tender means that the equipment will be Type Tested Assemble (TTA) at the same voltage and current rating will be as same or above in terms of Technical Specification or description in the BOQ items. 

Field Name Old Value New Value
Document last selling date & time 20/03/2022 12:00 23/03/2022 17:00
Opening Date & Time 20/03/2022 15:00 24/03/2022 15:00
Last date & time for Tender/Proposal Security Submission 20/03/2022 12:00 23/03/2022 17:00
Closing Date & Time 20/03/2022 15:00 24/03/2022 15:00
 Amendment / Corrigendum No. :  3 
Amendment / Corrigendum Text :

Need to clarify on specification for BOQ item no. 7 & 12 (a)

Field Name Old Value New Value
Document last selling date & time 13/03/2022 17:00 20/03/2022 12:00
Opening Date & Time 14/03/2022 12:00 20/03/2022 15:00
Last date & time for Tender/Proposal Security Submission 13/03/2022 17:00 20/03/2022 12:00
Closing Date & Time 14/03/2022 12:00 20/03/2022 15:00
Amendment / Corrigendum/ Addendum No. : 3
S. No. File Name File Description File Size
(in KB)
1 Clarification on Specification.pdf Clarification on specification 1295206
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text :

Need to amend some parameters in TDS clausses

Field Name Old Value New Value
Document last selling date & time 08/03/2022 17:00 13/03/2022 17:00
Opening Date & Time 09/03/2022 12:00 14/03/2022 12:00
Last date & time for Tender/Proposal Security Submission 08/03/2022 17:00 13/03/2022 17:00
Closing Date & Time 09/03/2022 12:00 14/03/2022 12:00
TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [15 (fifteen) ] years.

 

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [1(single)] contract(s) of similar nature(Providing,installation,testing & commissioning of Substation works) complexity and methods/construction technology successfully completed within the last [10] years, each with a value of at least Tk. [ 10,50,00,000.00].

(Above specific experience will be considered only for any Govt./Semi Govt./Autonomous organization)


 

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [10 (ten) ] years.

 

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [1(single)] contract(s) of similar nature(Providing,installation,testing & commissioning of Substation works) complexity and methods/construction technology successfully completed within the last [10] years, each with a value of at least Tk. [ 10,50,00,000.00].

(Above specific experience will be considered only for any Govt./Semi Govt./Autonomous organization)


 

TDS/PDS--D. Tender Preparation--

The Tenderer shall submit with its Tender the following additional documents:


1. Warranty certificate from the Manufacturer for the System at least 2 (Two) years from the date of completion of work.
2. A declaration letter of Brand Name, Country of Origin, Model No for offered Equipment as per BOQ (as applicable) by filling the form( COO form-A) as attached in Section-8.

3. A declaration to the effect that the bidder has got the scope of work fully clarifled.

4. Tenderer shall have to submit manufacturers Certificate to the effect that the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender.

5.The bidder must mention the year of manufacture of the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022.

6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender.

7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim.

8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim.

9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board.

10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years.

11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 

12. Manufacturer must have at least 10(ten) years experience in manufaturing similar equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim.

13. HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender.

14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender.

15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.

16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
17. Academic and experience certificate of proposed Engineers and key staff as per list given in TDS under ITT
sub-clause 17.1 have to be submitted along with the tender.
18. Detailed information regarding Proposed Plant, Machinery and Equipment as mentioned in TDS under ITT
sub-clause 18.1 the bidder must have to submit documentary evidence along with the tender.
19. Information of Imported Items including Manuals and documents such as Catalogue, Brochure, and Literature for each imported systems have to be submitted along with the tender.
20. Manufacturer’s authorization letter for  BOQ ( item no. 2.1,2.2,2.3,3.1,3.2,5.1,5.2,6.1,6.2,7 & Cable item no. 9 & 12) as the following Format:

“Manufacturer’s Authorisation Letter”
Invitation for Tender No, Date:
Tender Package No:
Tender Lot No(when applicable):
To:
[Name and address of Procuring Entity]
WHEREAS
We [insert complete name of Manufacturer],
who are official manufacturers of [insert type of goods manufactured], having factories at [insert full address of Manufacturer’s factories], do hereby
authorize [insert complete name of Tenderer] to supply the following Goods, manufactured by us [insert name and or brief description of the Goods].
We hereby extend our full guarantee and warranty as stated under GCC Clause 57.1 of the General Conditions of Contract, with respect to the Goods offered by the above Tenderer.
Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]
Name: [insert complete name(s) of authorized representative(s) of the Manufacturer]
Address: [insert full address including Fax and e-mail]
Title: [insert title]
Date: [insert date of signing]


21.The bidder must have to submit the following documents a) Security plan b) procedure for controlling safety management system (SMS) c)  Works Program d) Method of Statement along with the tender.
22. Consent letter to carry out Factory Acceptance Test as mentioned below :
Products:11KV HT Switchgear,Transformer,LT switchgear,BBT system
Type of Test: Factory Acceptance Test (FAT)
Time or milestone: Before shipment/acceptance
Place: Manufacturing plant/factory
Procedure: Standard

The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.

 

23. Consent letter to carry out Training as mentioned below:
Products: 11KV HT Switchgear,Transformer,LT switchgear
Type of Training:

a. Factory Training

Place: Manufacturing plant/factory

The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training  will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

b. Local Training at Site (10 Persons)
Time or milestone: 10 days
Place: At Site.

Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per
diem to each person shall be borne by the contractor.

The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder.

24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge)

25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender.

26. The bidder must have to follow the instructions or requirements attached in particular specification documents.

a) Conceptual drawings

b) Required installation manual comprising

i)Technical data sheet which is practically incorporated in the system.

ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information.

27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this.

28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.


N.B:
i. Tenderers Similar work experience related documents like Notification of award; work completion certificate etc issued by a senior officer of the client.(Contact details of the client to be clearly mentioned with email address) to be submitted with
the Tender.

The Tenderer shall submit with its Tender the following additional documents:


1. Warranty certificate from the Manufacturer for the System at least 2 (Two) years from the date of completion of work.
2. A declaration letter of Brand Name, Country of Origin, Model No for offered Equipment as per BOQ (as applicable) by filling the form( COO form-A) as attached in Section-8.

3. A declaration to the effect that the bidder has got the scope of work fully clarifled.

4. Tenderer shall have to submit manufacturers Certificate to the effect that the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender.

5.The bidder must mention the year of manufacture of the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022.

6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender.

7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim.

8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for offered 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim.

9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board.

10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years.

11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 

12. Manufacturer must have at least 10(ten) years experience in manufaturing similar/offered equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim.

13. Offered HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender.

14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender.

15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.

16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
17. Academic and experience certificate of proposed Engineers and key staff as per list given in TDS under ITT
sub-clause 17.1 have to be submitted along with the tender.
18. Detailed information regarding Proposed Plant, Machinery and Equipment as mentioned in TDS under ITT
sub-clause 18.1 the bidder must have to submit documentary evidence along with the tender.
19. Information of Imported Items including Manuals and documents such as Catalogue, Brochure, and Literature for each imported systems have to be submitted along with the tender.
20. Manufacturer’s authorization letter for  BOQ ( item no. 2.1,2.2,2.3,3.1,3.2,5.1,5.2,6.1,6.2,7 & Cable item no. 9 & 12) as the following Format:

“Manufacturer’s Authorisation Letter”
Invitation for Tender No, Date:
Tender Package No:
Tender Lot No(when applicable):
To:
[Name and address of Procuring Entity]
WHEREAS
We [insert complete name of Manufacturer],
who are official manufacturers of [insert type of goods manufactured], having factories at [insert full address of Manufacturer’s factories], do hereby
authorize [insert complete name of Tenderer] to supply the following Goods, manufactured by us [insert name and or brief description of the Goods].
We hereby extend our full guarantee and warranty as stated under GCC Clause 57.1 of the General Conditions of Contract, with respect to the Goods offered by the above Tenderer.
Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]
Name: [insert complete name(s) of authorized representative(s) of the Manufacturer]
Address: [insert full address including Fax and e-mail]
Title: [insert title]
Date: [insert date of signing]


21.The bidder must have to submit the following documents a) Security plan b) procedure for controlling safety management system (SMS) c)  Works Program d) Method of Statement along with the tender.
22. Consent letter to carry out Factory Acceptance Test as mentioned below :
Products:11KV HT Switchgear,Transformer,LT switchgear,BBT system
Type of Test: Factory Acceptance Test (FAT)
Time or milestone: Before shipment/acceptance
Place: Manufacturing plant/factory
Procedure: Standard

The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.

 

23. Consent letter to carry out Training as mentioned below:
Products: 11KV HT Switchgear,Transformer,LT switchgear
Type of Training:

a. Factory Training

Place: Manufacturing plant/factory

The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training  will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

b. Local Training at Site (10 Persons)
Time or milestone: 10 days
Place: At Site.

Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per
diem to each person shall be borne by the contractor.

The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder.

24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge)

25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender.

26. The bidder must have to follow the instructions or requirements attached in particular specification documents.

a) Conceptual drawings

b) Required installation manual comprising

i)Technical data sheet which is practically incorporated in the system.

ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information.

27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this.

28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.


N.B:
i. Tenderers Similar work experience related documents like Notification of award; work completion certificate etc issued by a senior officer of the client.(Contact details of the client to be clearly mentioned with email address) to be submitted with
the Tender.

TDS/PDS--D. Tender Preparation--

The Tenderer shall submit with its Tender the following additional documents:


1. Warranty certificate from the Manufacturer for the System at least 2 (Two) years from the date of completion of work.
2. A declaration letter of Brand Name, Country of Origin, Model No for offered Equipment as per BOQ (as applicable) by filling the form( COO form-A) as attached in Section-8.

3. A declaration to the effect that the bidder has got the scope of work fully clarifled.

4. Tenderer shall have to submit manufacturers Certificate to the effect that the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender.

5.The bidder must mention the year of manufacture of the 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022.

6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender.

7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim.

8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim.

9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board.

10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years.

11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 

12. Manufacturer must have at least 10(ten) years experience in manufaturing similar equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim.

13. HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender.

14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender.

15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.

16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
17. Academic and experience certificate of proposed Engineers and key staff as per list given in TDS under ITT
sub-clause 17.1 have to be submitted along with the tender.
18. Detailed information regarding Proposed Plant, Machinery and Equipment as mentioned in TDS under ITT
sub-clause 18.1 the bidder must have to submit documentary evidence along with the tender.
19. Information of Imported Items including Manuals and documents such as Catalogue, Brochure, and Literature for each imported systems have to be submitted along with the tender.
20. Manufacturer’s authorization letter for  BOQ ( item no. 2.1,2.2,2.3,3.1,3.2,5.1,5.2,6.1,6.2,7 & Cable item no. 9 & 12) as the following Format:

“Manufacturer’s Authorisation Letter”
Invitation for Tender No, Date:
Tender Package No:
Tender Lot No(when applicable):
To:
[Name and address of Procuring Entity]
WHEREAS
We [insert complete name of Manufacturer],
who are official manufacturers of [insert type of goods manufactured], having factories at [insert full address of Manufacturer’s factories], do hereby
authorize [insert complete name of Tenderer] to supply the following Goods, manufactured by us [insert name and or brief description of the Goods].
We hereby extend our full guarantee and warranty as stated under GCC Clause 57.1 of the General Conditions of Contract, with respect to the Goods offered by the above Tenderer.
Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]
Name: [insert complete name(s) of authorized representative(s) of the Manufacturer]
Address: [insert full address including Fax and e-mail]
Title: [insert title]
Date: [insert date of signing]


21.The bidder must have to submit the following documents a) Security plan b) procedure for controlling safety management system (SMS) c)  Works Program d) Method of Statement along with the tender.
22. Consent letter to carry out Factory Acceptance Test as mentioned below :
Products:11KV HT Switchgear,Transformer,LT switchgear,BBT system
Type of Test: Factory Acceptance Test (FAT)
Time or milestone: Before shipment/acceptance
Place: Manufacturing plant/factory
Procedure: Standard

The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.

 

23. Consent letter to carry out Training as mentioned below:
Products: 11KV HT Switchgear,Transformer,LT switchgear
Type of Training:

a. Factory Training

Place: Manufacturing plant/factory

The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training  will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

b. Local Training at Site (10 Persons)
Time or milestone: 10 days
Place: At Site.

Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per
diem to each person shall be borne by the contractor.

The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder.

24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge)

25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender.

26. The bidder must have to follow the instructions or requirements attached in particular specification documents.

a) Conceptual drawings

b) Required installation manual comprising

i)Technical data sheet which is practically incorporated in the system.

ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information.

27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this.

28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.


N.B:
i. Tenderers Similar work experience related documents like Notification of award; work completion certificate etc issued by a senior officer of the client.(Contact details of the client to be clearly mentioned with email address) to be submitted with
the Tender.

The Tenderer shall submit with its Tender the following additional documents:


1. Warranty certificate from the Manufacturer for the System at least 2 (Two) years from the date of completion of work.
2. A declaration letter of Brand Name, Country of Origin, Model No for offered Equipment as per BOQ (as applicable) by filling the form( COO form-A) as attached in Section-8.

3. A declaration to the effect that the bidder has got the scope of work fully clarifled.

4. Tenderer shall have to submit manufacturers Certificate to the effect that the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT and all major related accessories are latest model and suitable for use in tropical country like Bangladesh along with Tender.

5.The bidder must mention the year of manufacture of the offered 11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT along with the Tender and the year of manufacture should not be earlier than 2022.

6.The work should not be awarded to any sub-contractor. A decleration in this regard has to be submitted along with Tender.

7.The bidder shall submit a certificate by manufacturing company stated that the proposed 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT etc have been supplied to at least 10 (Ten) customers in different countries including Europe / North America / South America.Bidder must submit supporting document to authenticate the claim.

8.The bidder must submit the TTA (Type tested Assembled) Certificate from any reputed international Labrotories in EU / USA such as CESI / KEMA / ASTA etc. for offered 11 KV HT Switchgears, Dry type cast ragin Transformer,LT switchgear panel,PFI panel,BBT. Bidder must submit supporting document to authenticate the claim.

9.The bidder shall have ABC class contractory and supervisory license (E/M ) provided by the electric licensing board.

10.The bidder shall give assurance from the manufacturing company for availivility of spare parts for minimum 15 years.

11. The Tenderer must declare the Brand Name, Country of Origin and Port of Shipment of the offered Sub-Station Equipments (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT) in their Letterhead Pad and Port of Shipment must be in the country of origin or nearby port (in case of landlocked country). 

12. Manufacturer must have at least 10(ten) years experience in manufaturing similar/offered equipment(11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT). Bidder must submit supporting document to authenticate the claim.

13. Offered HT panel should be tested for extreme condition like seismic condition. Necessary certificate/paper from relevant independent laboratory supporting this feature of the offered equipment are to be submitted along with tender.

14. Manufacturer of the offered equipment (11 KV HT Switchgears,Transformer,LT switchgear panel,PFI panel,BBT,cables) must have ISO certificate and have to submit along with tender.

15. The manufacturer must have Local agent in Bangladesh. An agreement signed by both parties i,e Manufacturer and Local Agent is to be submitted along with the Tender include office Set Up and man power details.

16. In case of JV, The responsibility of each partner and their ratio of participation to be clearly stated in the agreement.
17. Academic and experience certificate of proposed Engineers and key staff as per list given in TDS under ITT
sub-clause 17.1 have to be submitted along with the tender.
18. Detailed information regarding Proposed Plant, Machinery and Equipment as mentioned in TDS under ITT
sub-clause 18.1 the bidder must have to submit documentary evidence along with the tender.
19. Information of Imported Items including Manuals and documents such as Catalogue, Brochure, and Literature for each imported systems have to be submitted along with the tender.
20. Manufacturer’s authorization letter for  BOQ ( item no. 2.1,2.2,2.3,3.1,3.2,5.1,5.2,6.1,6.2,7 & Cable item no. 9 & 12) as the following Format:

“Manufacturer’s Authorisation Letter”
Invitation for Tender No, Date:
Tender Package No:
Tender Lot No(when applicable):
To:
[Name and address of Procuring Entity]
WHEREAS
We [insert complete name of Manufacturer],
who are official manufacturers of [insert type of goods manufactured], having factories at [insert full address of Manufacturer’s factories], do hereby
authorize [insert complete name of Tenderer] to supply the following Goods, manufactured by us [insert name and or brief description of the Goods].
We hereby extend our full guarantee and warranty as stated under GCC Clause 57.1 of the General Conditions of Contract, with respect to the Goods offered by the above Tenderer.
Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]
Name: [insert complete name(s) of authorized representative(s) of the Manufacturer]
Address: [insert full address including Fax and e-mail]
Title: [insert title]
Date: [insert date of signing]


21.The bidder must have to submit the following documents a) Security plan b) procedure for controlling safety management system (SMS) c)  Works Program d) Method of Statement along with the tender.
22. Consent letter to carry out Factory Acceptance Test as mentioned below :
Products:11KV HT Switchgear,Transformer,LT switchgear,BBT system
Type of Test: Factory Acceptance Test (FAT)
Time or milestone: Before shipment/acceptance
Place: Manufacturing plant/factory
Procedure: Standard

The Engineering Team (Consist of at least Three E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel and One for Transformer) nominated by the PE will witness the Factory Acceptance Test (FAT) at the manufacturer's Plant. The duration of this Factory Acceptance Test will be 7 (Seven) days. The contractor shall arrange this test before shipment and bear all the cost of such test including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 250 (Two Hundred Fidty) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

The bidder shall submit a consent letter to carry out the FAT at least to the extent specified above if awarded to the bidder.

 

23. Consent letter to carry out Training as mentioned below:
Products: 11KV HT Switchgear,Transformer,LT switchgear
Type of Training:

a. Factory Training

Place: Manufacturing plant/factory

The Engineering Team (Consist of at least Two E/M Engineers - Two for TTA HT Panel, TTA LT Panel, TTA PFI Panel) nominated by the PE will witness the training at the manufacturer's Plant. The duration of this training  will be 7 (Seven) days. The contractor shall arrange this training and bear all the cost of such traing including all cost related to air travelling, hotel accommodation etc. Expenses covering food and others amounting to US Dollar 200 (Two Hundred) per day for each Engineer of CAAB shall also be borne by the Contractor at its own cost for this purposes.

b. Local Training at Site (10 Persons)
Time or milestone: 10 days
Place: At Site.

Local Training team shall comprise of 10 personnels for a period of 10 days for item mentioned above. The contractor shall bear the cost of local transportation and other expenses. In addition daily allowance of Taka 1000.00 per
diem to each person shall be borne by the contractor.

The bidder shall submit a consent letter to carry out the training at least to the extent specified above if awarded to the bidder.

24.The bidder must have to submit a consent letter regarding the scope of work that HT/LT switchgear will be matched with 2x1250 KVA Engine generator set (if) for change over from PDB to Emergency or Emergency to PDB line,if the contract has been awarded to the bidder.(if applicable & as per instruction of Engineer-in-charge)

25. All PDB related works i.e Demand load approval etc will be done by the contractor(if the bidder is awarded).The bidder must submit a consent letter along with the tender.

26. The bidder must have to follow the instructions or requirements attached in particular specification documents.

a) Conceptual drawings

b) Required installation manual comprising

i)Technical data sheet which is practically incorporated in the system.

ii) Part no. of all accessories of the systems by mentioning Country of origin and manufacturer information.

27.Cox's bazar Airport is an operational Airport and power supply should not be interrupted during Airport operation time.Successful bidder(Contractor) will have to take necessary measure to keep the power uninterrupted during installation,testing & commissioning.Contractor should help correspondance with PDB for commissioning of equipment and getting approval of substation i/c payement of any charge(if required).Any cost related to this will be deemed included in the quoted price.Bidders have to submit a declaration in their letterhead pad that they are fully aware of this.

28. Contractor shall be responsible for any damage if occure during shifting of necessary equipments and mend the damaged goods at his own cost.Tenderer shall submit a consent letter regarding this.


N.B:
i. Tenderers Similar work experience related documents like Notification of award; work completion certificate etc issued by a senior officer of the client.(Contact details of the client to be clearly mentioned with email address) to be submitted with
the Tender.

 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Need to amend some parameters in TDS & PCC Clauses.

Field Name Old Value New Value
Completion Date(Lot No : 1) 11/09/2022 02/04/2023
Eligibility of Consultant

As per Tender Documents.

As per Tender Documents.

PCC--B. Time Control--

Commencement Date of Works shall be as follows;Within 30 days after agreement sign(Total Execution time will be 180 days)

[insert different commencement dates for different parts of the Works, if deemed appropriate]
 

Commencement Date of Works shall be as follows;Within 30 days after agreement sign (Total duration of the works will be 36 months including defect liability period)

[insert different commencement dates for different parts of the Works, if deemed appropriate]
 

Start Date(Lot No : 1) 15/03/2022 03/04/2022
TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [22,00,00,000.00] over the last [5(five)] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [6,00,00,000.00]

Liquid assets certificate is accepted only in the following format:
"Letter of Commitment for Bank’s Undertaking for Line of Credit" issued by CPTU
The format is as follows:

Letter of Commitment for Bank’s undertaking for Line of Credit

Invitation for Tender No:
Date:
Tender Package No:
Lot No (when applicable)

To:
[Name and address of the Procuring Entity]


CREDIT COMMITTMENT No: [insert number]
We have been informed that [name of Tenderer] (hereinafter called “the Tenderer”) intends to submit to you its Tender (hereinafter called “the Tender”) for the execution of the Works of [description of works] under the above Invitation for Tenders (hereinafter called “the IFT”).
Furthermore, we understand that, according to your conditions, the Tenderer’s Financial Capacity i.e. Liquid Asset must be substantiated by a Letter of Commitment of Bank’s Undertaking for Line of Credit.
At the request of, and arrangement with, the Tenderer, we [name and address of the Bank] do hereby agree and undertake that [name and address of the Tenderer] will be provided by us with a revolving line of credit, in case awarded the Contract, for execution of the Works viz. [insert name of the works], for an amount not less than BDT[in figure] ( in words) for the sole purpose of the execution of the above Contract. This Revolving Line of Credit will be maintained by us until issuance of “Taking-Over Certificate” by the Procuring Entity.
In witness whereof, authorised representative of the Bank has hereunto signed and sealed this Letter of Commitment.

Signature                                                    Signature

The required average annual construction turnover shall be greater than Tk [6,75,00,000.00] over the last [5 (Five)] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [6,00,00,000.00]

Liquid assets certificate is accepted only in the following format:
"Letter of Commitment for Bank’s Undertaking for Line of Credit" issued by CPTU
The format is as follows:

Letter of Commitment for Bank’s undertaking for Line of Credit

Invitation for Tender No:
Date:
Tender Package No:
Lot No (when applicable)

To:
[Name and address of the Procuring Entity]


CREDIT COMMITTMENT No: [insert number]
We have been informed that [name of Tenderer] (hereinafter called “the Tenderer”) intends to submit to you its Tender (hereinafter called “the Tender”) for the execution of the Works of [description of works] under the above Invitation for Tenders (hereinafter called “the IFT”).
Furthermore, we understand that, according to your conditions, the Tenderer’s Financial Capacity i.e. Liquid Asset must be substantiated by a Letter of Commitment of Bank’s Undertaking for Line of Credit.
At the request of, and arrangement with, the Tenderer, we [name and address of the Bank] do hereby agree and undertake that [name and address of the Tenderer] will be provided by us with a revolving line of credit, in case awarded the Contract, for execution of the Works viz. [insert name of the works], for an amount not less than BDT[in figure] ( in words) for the sole purpose of the execution of the above Contract. This Revolving Line of Credit will be maintained by us until issuance of “Taking-Over Certificate” by the Procuring Entity.
In witness whereof, authorised representative of the Bank has hereunto signed and sealed this Letter of Commitment.

Signature                                                    Signature

Brief Description of Goods,Works or Service

Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport.

Development of electric supply system in/c relared works at Cox's Bazar Airport- Providing, Installation, Testing & Commissioning of HT Switchgear, LT Panel, PFI Panel, Transformer, AVR in/c other related works at Cox's Bazar Airport.

 