| Eligibility of Tenderer : |
1) As described in the Tender Documents.
2) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Management Contractor shall be 05(five) years. [years will be counted backward from the date of publication of IFT in the newspaper].
3) The minimum specific experience as a Prime Contractor or Management Contractor in construction works of at least 1 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, with a value of at least BDT 1205.00 Lakh. [years will be counted backward from the date of publication of IFT in the newspaper].
4) The required average annual construction turnover shall be greater than BDT 2660.00 Lakh over the last 5 (five) years. [years will be counted backward from the date of publication of IFT in the newspaper].
5) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be BDT 376.00 Lakh.
6)The Minimum Tender Capacity shall be BDT 1605.00 Lakh
|
| Brief Description of Works : |
R-1091: Construction of BC road starting from BAU Post office to Siri Ghat in ward no-21.(Length;Part-A=264m,Part-B=78m,Part-C=79m,Part-D=100m,Part-E=20m; Total=541m). R-1093: Construction of RCC road starting from near BAU Dairy Firm to K-Type Bhabon in ward no-21.(Length=110m,3nos Link=(5X3)=15m; Total=125m). R-1094:Construction of BC road starting from BAU Yasin Market to Poultry mour in ward no-21.(Lengt; Part-A=801m,Part-B=120m,Part-C=21m,Part-D=390m Part-E=870m Total=2202m & 1 no Culvert). R-1095: Construction of RCC road starting from BAU Guest house to Balu Saheb house via G-8 no gate in ward no-21.(Length=180m,4nos link(4X5)=20m; Total=200m) R-1097: Construction of RCC road in front of MLSS quarter near BAU warden quarter in ward no-21.(Length; Part-A=180m, Link-1=20m, Link-2=22m, Link-3=5m; Total=227m) R-1098: Construction of BC/RCC road infront of FRI BINA in ward no-21.(Length;Part-A,RCC=360m,Part-B,BC=652m,Link-1,RCC=83m,RCC Chottor=50m; Total=1145m) R-1099: Construction of RCC road arround of Baitul Aman Mosque pond in ward no-21.(Length=400m) D-1110: Construction of RCC drain at BAU shes mour river side in ward no-21 (Shes mour to Botanical Garden). (Length=850m). D-1111: Construction of RCC drain near BAU MLSS quarter in ward no-21.(Length=(158X2)=316m, Link-1:inside KBI high school=90m;Total=406m) D-1112: Construction of RCC drain inside of BAU area in ward no-21.(from Sohrawardi Hall to BFRI last boundary,Length;Part-A=300m; Part-B=285m; Part-C=324m;Part-D=1950m; Total=2859m) D-1113:Construction of RCC pipe drain and footpath starting from Bangladesh Agriculture University administrative office to Shes mour in ward no-21.(Length=1465m) D-1114: Construction of RCC drain Beside KB college in ward no-21.(Length: Part-A =175m,Part-B=210m ; Total=385m)
|