View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Local Government Engineering Department (LGED) Procuring Entity Name : Office of the Upazila Engineer, LGED, Madhupur, Tangail
Procuring Entity Code : Procuring Entity District : Tangail
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : App ID : 182802 Tender/Proposal Status :
App ID : 182802 Tender/Proposal ID : 659583
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government, Aid or Grant
Particular Information :
Project Code : 2242237900 Project Name : Fourth Primary Education Development Program
Tender/Proposal Package No. and Description : e-Tender/PEDP4/TAN/MOD/2020-2021/W2-03725
Construction of additional class room CHARALJANI GPS under PEDP4.
Category : Construction work; Site preparation work; Works for complete or part construction and civil engineering work; Building installation work; Building completion work; Hire of construction and civil engineering machinery and equipment with operator;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
23-Feb-2022 10:00 Tender/Proposal Document last selling /
downloading Date and Time :
15-Mar-2022 14:00
Pre - Tender/Proposal meeting Start
Date and Time :
23-Feb-2022 11:00 Pre - Tender/Proposal meeting End
Date and Time :
13-Mar-2022 17:00
Tender/Proposal Closing
Date and Time :
16-Mar-2022 12:00 Tender/Proposal Opening
Date and Time :
16-Mar-2022 12:00
Last Date and Time for Tender/Proposal Security
Submission :
15-Mar-2022 15:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per TDS

Brief Description of Works :

Construction of additional class room CHARALJANI GPS under PEDP4.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 2000
Mode of Payment :
Tender/Proposal Security Valid Up to : 27-Jun-2022
Tender/Proposal Valid Up to : 30-May-2022
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Construction of additional class room CHARALJANI GPS under PEDP4. Madhupur Upazila 210000 25-Apr-2022 24-Jan-2023
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Bidyut Kumer Das Designation of Official Inviting Tender/Proposal : Upazila Engineer
Address of Official Inviting Tender/Proposal :
Address: Upazila Parishad, Madhupur, Tangail
City: Madhupur
Thana: Madhupur
District: Tangail - 1976
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 09228-56080
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Correction From TDS & PCC

Field Name Old Value New Value
Completion Date(Lot No : 1) 26/01/2023 24/01/2023
Document last selling date & time 09/03/2022 14:00 15/03/2022 14:00
Eligibility of Consultant

As per TDS

As per TDS

Location(Lot No : 1) Madupur Upazila Madhupur Upazila
Opening Date & Time 10/03/2022 12:00 16/03/2022 12:00
PCC--A. General--

The PE is:

Bidyut Kumer Das

Upazila Engineer,

Madhupur,Tangail

The PE is:

Md. Joynal Abedin

Upazila Engineer,

Madhupur,Tangail

PCC--A. General--

The PE is:

Bidyut Kumer Das

Upazila Engineer,

Madhupur,Tangail

GCC 1.1 (tt)
The names of the development Partners are:
Asian Development Bank (ADB)
International Development Association (IDA)
Australian agency for International Development (Aus.-AID)
Canadian International Development Agency (CIDA)
Department for International Development (of the United Kingdom) DFID
European Union (EU)
Japan international Cooperation agency (JICA)
Swedish international Development agency (SIDA)
United Nations Children’s Fund (UNICEF)

GCC 39.2(b) please read the following instead of existing:
“Fraudulent practice” means any act or the misrepresentation or omission of facts in order to influence a decision to be taken in a Procurement proceeding or contract execution or that knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an obligation.

GCC 39.2(c) please read the following instead of existing:
‘‘Collusive practice” means a scheme or arrangement between two (2) or more Persons, with or without the knowledge of the PE, that is designed to arbitrarily reduce the number of Tenders submitted or fix Tender prices at artificial, non-competitive levels, thereby denying a PE the benefits of competitive price arising from genuine and open competition or which is designed to achieve an improper purpose, including influencing improperly the actions of another party.

GCC 39.2(d) please read the following instead
of existing: ‘‘Coercive Practice’’ means impairing or harming or threatening to impair or harm, directly or indirectly, persons or their property to influence improperly the actions of a party, or to influence a decision to be taken in the procurement proceeding or the execution of a contract, and this will include creating obstructions in the normal submission process used for tenders.

GCC 39.2(e) please read the following in addition to the existing:
“Or, acts intended to materially impede the exercise of the right of the Development partner to inspect all accounts, records, and other documents relating to the submission of bids and contract performance and to have them audited by the auditors appointed by the Development partner or the Government”

The PE is:

Md. Joynal Abedin

Upazila Engineer,

Madhupur,Tangail

GCC 1.1 (tt)
The names of the development Partners are:
Asian Development Bank (ADB)
International Development Association (IDA)
Australian agency for International Development (Aus.-AID)
Canadian International Development Agency (CIDA)
Department for International Development (of the United Kingdom) DFID
European Union (EU)
Japan international Cooperation agency (JICA)
Swedish international Development agency (SIDA)
United Nations Children’s Fund (UNICEF)

GCC 39.2(b) please read the following instead of existing:
“Fraudulent practice” means any act or the misrepresentation or omission of facts in order to influence a decision to be taken in a Procurement proceeding or contract execution or that knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an obligation.

GCC 39.2(c) please read the following instead of existing:
‘‘Collusive practice” means a scheme or arrangement between two (2) or more Persons, with or without the knowledge of the PE, that is designed to arbitrarily reduce the number of Tenders submitted or fix Tender prices at artificial, non-competitive levels, thereby denying a PE the benefits of competitive price arising from genuine and open competition or which is designed to achieve an improper purpose, including influencing improperly the actions of another party.

GCC 39.2(d) please read the following instead
of existing: ‘‘Coercive Practice’’ means impairing or harming or threatening to impair or harm, directly or indirectly, persons or their property to influence improperly the actions of a party, or to influence a decision to be taken in the procurement proceeding or the execution of a contract, and this will include creating obstructions in the normal submission process used for tenders.

GCC 39.2(e) please read the following in addition to the existing:
“Or, acts intended to materially impede the exercise of the right of the Development partner to inspect all accounts, records, and other documents relating to the submission of bids and contract performance and to have them audited by the auditors appointed by the Development partner or the Government”

PCC--A. General--

The PE is:

Bidyut Kumer Das

Upazila Engineer,

Madhupur,Tangail

The PE is:

Md. Joynal Abedin

Upazila Engineer,

Madhupur,Tangail

PCC--A. General--

The PE’s address for the purpose of communications under this contract is :
Contact person: Bidyut Kumer Das,Upazila Engineer.

Address: Madhupur,Tangail.
Tel:, Fax:
e-mail address: ue.madhupur@lged.gov.bd


The Contractor’s address for the purpose of communications under this contract is :
Contact person:Bidyut Kumer Das,Upazila Engineer.
Address:Madhupur,Tangail.
Tel:
Fax:
e-mail address:ue.madhupur@lged.gov.bd

The PE’s address for the purpose of communications under this contract is :
Contact person: Md. Joynal Abedin,Upazila Engineer.

Address: Madhupur,Tangail.
Tel:, Fax:
e-mail address: ue.madhupur@lged.gov.bd


The Contractor’s address for the purpose of communications under this contract is :
Contact person:Md. Joynal Abedin,Upazila Engineer.
Address:Madhupur,Tangail.
Tel:
Fax:
e-mail address:ue.madhupur@lged.gov.bd

PCC--C. Quality Control--

The Defects Liability Period is [state months]

[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].

The Defects Liability Period is: 12 (Twelve) Months.

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:


[list events or state none ]

The following additional events shall also be the Compensation Events: None

PCC--D. Cost Control--

The Contract is not subject to price adjustment.
OR
The Contract is subject to price adjustment, the weightings or coefficients for adjustment are:

[Price Adjustment Formulae to be applicable if stated under ITT Sub Clause 27.10 shall be specified here]
Example:
P= A + a (Lm/Lo)+ b (BIm/BIo)+ c (CEm/CEo)+ d (RSm/RSo)+ e (STm/STo)+ f (BRm/BRo)+g (MIm/MIo) + h (FUm/FUo)+ etc
where;
L= Labor, BI=Bitumen, CE=Cement, RS=Reinforcing Steel, ST=Stone, BR=Bricks, MI=Miscellaneous, FU= Fuel ]
Weighting or Coefficient A equals between 0.10 and 0.15 and, B (a+b+c+d+e+f+g+h+etc) equals between 0.90 and 0.85.

[insert figure] non-adjustable component (coefficient A)
[insert figure] adjustable component (coefficient B)
[The sum of A+B shall equal ONE (1). It is usual to have value of A between 0.10 and 0.15 and that of B between 0.90 and 0.85. Breakdown of B shall be provided in Appendix to the Tender.]
[delete as appropriate]

[price adjustment clauses are usually only permitted for Works Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The PE must consider each Contract on its individual merit; approval of HOPE required for Contracts of less than eighteen (18) months]

The Contract is not subject to price adjustment.

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.


[state “none’ if not applicable. If applicable then the proportion of Retention Money shall be equal to the percentage-shortfall of ten (10) percent of Performance Security determined at the time of signing the Contract. Again in case of unbalanced Tender or because of front loading, provision for Retention Money shall not be applicable]

The proportion of payments to be retained is 5 (Five) percent from each progressive payment & 10 (Ten) percent from final account (total final billed amount).

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of its Contract price per day of delay]
Guide to application of GCC Sub Clause 76.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x Px n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay
n = No of days of delay for completion of works under the Contract]

 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.


[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is: 0.01 (Zero point zero one) percent of its Contract price per day of delay.

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is: 10 (Ten) percent of the final Contract price of the whole of the Works.

PCC--D. Cost Control--

The Bonus for the whole of the Works is [insert percentage] percent of the final Contract price per day.

The maximum amount of Bonus for the whole of the Works is [insert percentage] percent of the final Contract price.

[if early completion would provide benefits to the PE, this clause should remain, otherwise state “Not Applicable”. The bonus is usually numerically equal to the Liquidated Damages]

The Bonus for the whole of the Works is: N/A]

PCC--D. Cost Control--

The Advance Payment shall be Tk [insert amount] and shall be paid to the Contractor not later than [insert date].

[for 100 percent GoB funded procurement, advance payments are not recommended unless otherwise specifically decided by the Government. An advance payment, if admissible, shall be made for mobilisation, considering the nature of the works. The recommended maximum advance payment is ten (10) percent of the original Contract price against an unconditional Bank Guarantee (Form e-PW3-10.) On the contrary, advance payments may be applicable for procurements under aided projects]

The Advance Payment shall be Tk. N/A

PCC--D. Cost Control--

The percentage for adjustment of Provisional Sums is

____% (_________percent)
[state none, if not applicable. Usually covers the VAT, profit and overhead costs]

The percentage for adjustment of Provisional Sums is: N/A
 

PCC--E. Completion of the Contract--

The date by which “as-built” drawings are required is [insert date]

 

The date by which operating and maintenance manuals are required is [insert date]

The date by which “as-built” drawings are required is: N/A

PCC--E. Completion of the Contract--

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]

[usually a very nominal amount]

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is: N/A

PCC--F. Termination and Settlement of Disputes--

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is 10 [Ten] percent.

PCC--G. Claims, Disputes and Arbitration--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]

The arbitration shall be conducted in the place mentioned below;

LGED Bhaban, Agargaon, Sher-E- Bangla nagar, Dhaka 1207.

PCC--G. Claims, Disputes and Arbitration--

The Adjudicator jointly appointed by the parties is:
Name:
Address:
Tel No:
Fax No:
e-mail address:

 

In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh.

The Adjudicator jointly appointed by the parties is:
Mr. Soroj Kumar Sarker
Ex. Additional Chief Engineer, LGED, Dhaka.
Tel No:
Fax No:
e-mail address:

Meeting End Date & Time 08/03/2022 17:00 13/03/2022 17:00
Last date & time for Tender/Proposal Security Submission 10/03/2022 11:00 15/03/2022 15:00
Closing Date & Time 10/03/2022 12:00 16/03/2022 12:00
TDS/PDS--A. General--

The PE is Bidyut Kumer Das

The Name of the Tender is: Construction of additional class room CHARALJANI GPS under PEDP4.
Brief Description of the Works:

Tender Ref: APP ID : 182802

Lot No(s): 01

The PE is Md. Joynal Abedin

The Name of the Tender is: Construction of additional class room CHARALJANI GPS under PEDP4.
Brief Description of the Works:

Tender Ref: APP ID : 182802

Lot No(s): 01

TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years.

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 6,300,000 (Sixty Three lac )

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years.

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk. 63,00,000.00 (Sixty Three lac )

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk. 11,200,000 (One Crorer Twelve Lac) over the last 05 (Five) years.

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 2,500,000 (Twenty Five lac)

The required average annual construction turnover shall be greater than Tk. 1,12,00,000.00 (One Crore Twelve Lac) over the last 05 (Five) years.

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 25,00,000.00 (Twenty Five lac)

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be: 6,720,000 (Sixty Seven Lac Twenty Thousand)

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.

The minimum capacity shall be: 67,20,000 (Sixty Seven Lac Twenty Thousand)

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.

Brief Description of Goods,Works or Service

Construction of additional class room CHARALJANI GPS under PEDP4.

Construction of additional class room CHARALJANI GPS under PEDP4.

 
Save As PDF