View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The PPA amendment 2016 "The Quoted Tender will be nonresponsive if the Quoted Price is more than 10 percent less or 10 percent above of the official cost estimate" - not applicable for this Tender. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be Five (05) years. .(years counting backward from the date of publication of IFT in the newspaper) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least One (01) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last Five (05) years, each with a value of at least Tk. 12,00,000/- (Twelve Lac only).(years counting backward from the date of publication of IFT in the newspaper) The required average annual construction turnover shall be greater than Tk. 24,00,000/- (Twenty Four Lac only) over the last Five (05) years .(years counting backward from the date of publication of IFT in the newspaper) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 6,00,000/- (Six Lac only). (not before than the date of publishing IFT) (If the tenderers want to qualify more than one package, each package shall be qualified separately for average annual construction turnover & Liquid asset. In the case of liquid asset, certificate and statement from bank should be submitted. In the case of credit facilities , it should be sanctioned.) |
According to Memo No:21.364.002.02.15.464.2014-1757 dated 02.10.2016 of CPTU-The PPA amendment, 01 August,2016 "The Quoted Tender will be nonresponsive if the Quoted Price is more than 10 percent less or 10 percent above of the official cost estimate" for NCT and OTM Tender will not be applicable until PPR-2008 amendment have been done which is now under processing at Ministry of Law, Legislative and Parliamentary Affairs.
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be Five (05) years. .(years counting backward from the date of publication of IFT in the newspaper) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least One (01) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last Five (05) years, each with a value of at least Tk. 12,00,000/- (Twelve Lac only).(years counting backward from the date of publication of IFT in the newspaper) The required average annual construction turnover shall be greater than Tk. 24,00,000/- (Twenty Four Lac only) over the last Five (05) years .(years counting backward from the date of publication of IFT in the newspaper) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 6,00,000/- (Six Lac only). (not before than the date of publishing IFT) (If the tenderers want to qualify more than one package, each package shall be qualified separately for average annual construction turnover & Liquid asset. In the case of liquid asset, certificate and statement from bank should be submitted. In the case of credit facilities , it should be sanctioned.) |