AS Per TDS
Mobilization/Demobilization of Shore Pipes (369000 unit-pkm/m) by engine boat (40 ton capacity) including loading/unloading and the cost of all necessary fuel, lubricants etc. complete & Loading/unloading and stacking of shore pipe (900 unit-meter) including cost of all necessary accessories etc. complete as per direction of engineer in charge for Dredging work of Salamatpur at Faridpur Modukhali, Kamarkhali,from Km. 0.00 to 1.30 Km Under Khulna Dredger Operation Division ,BWDB,Lobonchora, Khulna During Year 2021-22