Criteria for Eligible contractor:
All the egp enlisted contractor satisfying the criteria mentioned in e-PW3 document attached herewith as per PPA-2006 and latest PPR-2008. The following conditions are applicable:
The all the conditions are specified in separate sheet attached in General specifications
Permanent Protective work with rehabilitation of Embankment at Napitkhali from km 7.330 to km 7.780 = 0.450 km in Polder No. 15 under " Rehabilitation of polder-15 at Satkhira District" under Satkhira O&M Division-1, BWDB, Satkhira during the year 2021-22