All the egp enlisted contractor satisfying the criteria mentioned in e-PW3 document attached herewith as per PPA-2006 and latest PPR-2008. The following conditions are applicable:
The all the conditions are specified in separate sheet attached in General specifications
Slope Protection work with rehabilitation of Embankment at Gabura from km 17.410 to km 19.500 = 2.090 km in Polder-15 under " Rehabilitation of polder-15 at Satkhira District" under Satkhira O&M Division-1, BWDB, Satkhira during the year 2021-22