View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Some Text have to add |
| Field Name | Old Value | New Value | ||||
|---|---|---|---|---|---|---|
| Completion Date(Lot No : 1) | 30/11/2022 | 30/10/2022 | ||||
| Document last selling date & time | 19/04/2022 17:00 | 24/04/2022 17:00 | ||||
| Eligibility of Consultant |
|
|
||||
| Opening Date & Time | 20/04/2022 13:30 | 24/04/2022 18:30 | ||||
| PCC--A. General-- |
The Procuring Entity is |
The Procuring Entity is Executive Engineer, DPHE, Netrokona. |
||||
| PCC--A. General-- |
The Project Manager is |
The Project Manager is None. |
||||
| PCC--A. General-- |
The Site is located at [location] and is defined in drawings No: |
The Site is located at different primary school of different upazilas of Netrokona District and is defined in drawings No:N/A. |
||||
| PCC--A. General-- |
The Works consist of |
The Works consist of as Per BoQ. |
||||
| PCC--A. General-- | Other documents forming part of the Contract are;
[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
Other documents forming part of the Contract are;
1. Work plan |
||||
| PCC--A. General-- | Possession of the Site to the Contractor shall be given on the following date;
[state date of possession of site] |
Possession of the Site to the Contractor shall be given on the following date; Within 07(Seven) days of contract signing. |
||||
| PCC--B. Time Control-- |
The Start Date shall be [insert date ] |
The Start Date shall be on 28 April, 2022. |
||||
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be [insert date] |
The Intended Completion Date for the whole of the Works shall be by 30 October, 2022. |
||||
| PCC--B. Time Control-- |
The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract. |
The Contractor shall submit a Programme for the Works within 7(Seven) days of signing the Contract. |
||||
| PCC--C. Quality Control-- |
The Defects Liability Period is [state months] |
The Defects Liability Period is 12(Twelve) Months. |
||||
| PCC--D. Cost Control-- |
The following additional events shall also be the Compensation Events: |
The following additional events shall also be the Compensation Events: None. |
||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent. |
The proportion of payments to be retained is 10(Ten) percent. |
||||
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages is 0.01 (Zero point zero one) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
||||
| PCC--D. Cost Control-- |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works. |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10(Ten) percent of the final Contract price of the whole of the Works. |
||||
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 10(Ten) percent. |
||||
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below;
DPHE Bhaban |
||||
| Last date & time for Tender/Proposal Security Submission | 19/04/2022 17:00 | 24/04/2022 17:00 | ||||
| Closing Date & Time | 20/04/2022 13:30 | 24/04/2022 18:30 | ||||
| TDS/PDS--A. General-- |
|
|
||||
| TDS/PDS--B. Tender Document-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till [Date and Time] N/A. |
||||
| TDS/PDS--C. Qualification Criteria-- | 10.1a The required average annual construction turnover shall be greater than Tk. 100.00 Lac over the last five years. ( Years counting backward from the date of publication of IFT in the eGP website) ( Tenderer must submit "Completion Certificate" in a format of CPTU Standard Completion Certificate. i.e contain all necessary information , no payment certificate will be counted however TEC might ask for payment certificate against any Completion Certificate. ) A typical standard Work Completion Certificate / Experience Certificate has been attached in Particular Specification section of this tender document.
[ the required average annual construction turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)] |
The required average annual construction turnover shall be greater than Tk. 1,20,00,000.00(One Crore and Twenty Lac) over the last 05(five) years.Years counting backward from the date of publication of IFT in the e-GP website. |
||||
| TDS/PDS--C. Qualification Criteria-- | 10.1a The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 30.00 Lac(Please note that in case of Line of Credit Certificate as a Liquid Asset certificate, the certificate must be substantiated by any scheduled Bank of Bangladesh in the format as specified (Form PW3-7, attached in Particular Specifications section of this e Tender documents) ,without alteration, issued not earlier than twenty eight (28) days prior to the day of the original deadline for submission of Tenders.
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 40,00,000.00(Forty Lac). |
||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
The minimum capacity shall be: Tk. 70,00,000.00(Seventy Lac).
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
||||
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk 80.00 Lac under single contract over a period of last five years shall be required. ( Years counting backward from the date of publication of IFT in the eGP website) ( Experience certificate must be in a format of CPTU Standard Certificate. i.e contain all necessary information ) A typical standard Work Completion Certificate / Experience Certificate has been attached in Particular Specification section of this tender document. [the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package] |
A satisfactory completion of similar works of at least Tk 60,00,000.00(Sixty Lac) under 01(One) contract over a period of last 05(Five) years shall be required. Years counting backward from the date of publication of IFT in the e-GP website. |
||||
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents: |
Tenderer shall submit with its Tender, the following additional documents:
1) Valid Trade Licence |
||||
| TDS/PDS--D. Tender Preparation-- | The Tender Validity period shall be [state number] days.
[normally 60 to 90 days deemed reasonable] |
The Tender Validity period shall be 90(Ninety) days. |
||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be [ state amount ] |
The amount of the Tender Security shall be Tk. 2,65,000.00(Two Lac and Sixty Five Thousand). |
||||
| TDS/PDS--E. e-Tender Submission-- |
The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m] |
The deadline for lodgment of e-Tenders is mentioned in IFT. |
||||
| Brief Description of Goods,Works or Service | WB-NNGPS-912 |
WB-NNGPS-912 |
||||
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 300000.0 | 265000 |