View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Department of Public Health Engineering (DPHE) Procuring Entity Name : Office of the Executive Engineer,DPHE,Netrokona
Procuring Entity Code : Procuring Entity District : Netrokona
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 46.03.7200.061.07.099.22-2425. Dt- 03-04-2022 Tender/Proposal Status :
App ID : 184052 Tender/Proposal ID : 681310
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 5-2431-5006 Project Name : Need Based Infrastructure Development od Newly Nationalized Government PrimarySchools (1st Phase)(NBIDNNGPS-1)
Tender/Proposal Package No. and Description : WB-NNGPS-912
Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
03-Apr-2022 22:25 Tender/Proposal Document last selling /
downloading Date and Time :
24-Apr-2022 17:00
Pre - Tender/Proposal meeting Start
Date and Time :
04-Apr-2022 17:25 Pre - Tender/Proposal meeting End
Date and Time :
19-Apr-2022 17:25
Tender/Proposal Closing
Date and Time :
24-Apr-2022 18:30 Tender/Proposal Opening
Date and Time :
24-Apr-2022 18:30
Last Date and Time for Tender/Proposal Security
Submission :
24-Apr-2022 17:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :


1. This tender has been invited to construct multi storied WASH BLOCK (attached in school building ) in different primary schools and sites will be selected based on instructions from DPHE Headquarter. Sometimes it takes more time getting all the sites ready due to unavailability of eligible locations /criteria and sometimes need to wait more for other agencies to start construction of the main school buildings.
2. Possession of the sites to be taken within 7 days after getting any ready sites and confirming by the Executive Engineer
3. Sites can be located remotely or even in the haor area, tenderer must have the willing to work anywhere within Netrokona districts.
4. Utilization of steel shutter for all the concrete casting is a must.
5) Tenderers must upload a list of On-going Contracts and Current Commitments ( format attached in Particular Specifications section of this e Tender documents) under all PEs organization, Presenting false information and/or concealing any on going work information will be evaluated as technically Non-responsive and might be punishable under PPR 127-2(kha)
6) It can be noted that submission of any fake/false document and /or false information will result in the submitted tender as 'Non-Responsive' and steps will be taken against the concerned tenderer according to PPA, 2006 and PPR 2008 (last amendment).
7. Payment to be done based on availability of the fund.

Brief Description of Works :

WB-NNGPS-912
Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 2000
Mode of Payment :
Tender/Proposal Security Valid Up to : 20-Aug-2022
Tender/Proposal Valid Up to : 23-Jul-2022
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District . Different Upazila 265000 28-Apr-2022 30-Oct-2022
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : EE Netrokona Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Office of the Executive Engineer,DPHE,Netrokona
City: Netrokona
Thana: Netrokona
District: Netrokona - 2400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 09-5161397
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Some Text have to add

Field Name Old Value New Value
Completion Date(Lot No : 1) 30/11/2022 30/10/2022
Document last selling date & time 19/04/2022 17:00 24/04/2022 17:00
Eligibility of Consultant


1. This tender has been invited to construct multi storied WASH BLOCK (attached in school building ) in different primary schools and sites will be selected based on instructions from DPHE Headquarter. Sometimes it takes more time getting all the sites ready due to unavailability of eligible locations /criteria and sometimes need to wait more for other agencies to start construction of the main school buildings.
2. Possession of the sites to be taken within 7 days after getting any ready sites and confirming by the Executive Engineer
3. Sites can be located remotely or even in the haor area, tenderer must have the willing to work anywhere within Netrokona districts.
4. Utilization of steel shutter for all the concrete casting is a must.
5) Tenderers must upload a list of On-going Contracts and Current Commitments ( format attached in Particular Specifications section of this e Tender documents) under all PEs organization, Presenting false information and/or concealing any on going work information will be evaluated as technically Non-responsive and might be punishable under PPR 127-2(kha)
6) It can be noted that submission of any fake/false document and /or false information will result in the submitted tender as 'Non-Responsive' and steps will be taken against the concerned tenderer according to PPA, 2006 and PPR 2008 (last amendment).
7. Payment to be done based on availability of the fund.


1. This tender has been invited to construct multi storied WASH BLOCK (attached in school building ) in different primary schools and sites will be selected based on instructions from DPHE Headquarter. Sometimes it takes more time getting all the sites ready due to unavailability of eligible locations /criteria and sometimes need to wait more for other agencies to start construction of the main school buildings.
2. Possession of the sites to be taken within 7 days after getting any ready sites and confirming by the Executive Engineer
3. Sites can be located remotely or even in the haor area, tenderer must have the willing to work anywhere within Netrokona districts.
4. Utilization of steel shutter for all the concrete casting is a must.
5) Tenderers must upload a list of On-going Contracts and Current Commitments ( format attached in Particular Specifications section of this e Tender documents) under all PEs organization, Presenting false information and/or concealing any on going work information will be evaluated as technically Non-responsive and might be punishable under PPR 127-2(kha)
6) It can be noted that submission of any fake/false document and /or false information will result in the submitted tender as 'Non-Responsive' and steps will be taken against the concerned tenderer according to PPA, 2006 and PPR 2008 (last amendment).
7. Payment to be done based on availability of the fund.

Opening Date & Time 20/04/2022 13:30 24/04/2022 18:30
PCC--A. General--

The Procuring Entity is
[Name, address]
 

The Procuring Entity is Executive Engineer, DPHE, Netrokona.

PCC--A. General--

The Project Manager is
[Name, address]
 

The Project Manager is None.

PCC--A. General--

The Site is located at [location] and is defined in drawings No:
[insert numbers]
 

The Site is located at different primary school of different upazilas of Netrokona District and is defined in drawings No:N/A.
 

PCC--A. General--

The Works consist of
[state brief summary]
 

The Works consist of as Per BoQ.
 

PCC--A. General--

Other documents forming part of the Contract are;

[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]
 

Other documents forming part of the Contract are;

1. Work plan
2. Equipment List.

PCC--A. General--

Possession of the Site to the Contractor shall be given on the following date;

[state date of possession of site]
 

Possession of the Site to the Contractor shall be given on the following date;

Within 07(Seven) days of contract signing.

PCC--B. Time Control--

The Start Date shall be [insert date ]
[it is the last date when the Contractor shall commence execution of the Works under the Contract]
 

The Start Date shall be on 28 April, 2022.

PCC--B. Time Control--

The Intended Completion Date for the whole of the Works shall be [insert date]
[to be calculated from the start Date]
 

The Intended Completion Date for the whole of the Works shall be by 30 October, 2022.
 

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.
[usually ten (10) days or may be less]
 

The Contractor shall submit a Programme for the Works within 7(Seven) days of signing the Contract.
 

PCC--C. Quality Control--

The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is 12(Twelve) Months.

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

The following additional events shall also be the Compensation Events:

None.

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is 10(Ten) percent.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is 0.01 (Zero point zero one) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10(Ten) percent of the final Contract price of the whole of the Works.
 

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 10(Ten) percent.

PCC--H. Disputes and Settlement--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]
 

The arbitration shall be conducted in the place mentioned below;

DPHE Bhaban
14 Shahid Captain Monsur Ali Sharani, Kakrail, Dhaka-1000.
 

Last date & time for Tender/Proposal Security Submission 19/04/2022 17:00 24/04/2022 17:00
Closing Date & Time 20/04/2022 13:30 24/04/2022 18:30
TDS/PDS--A. General--

 

The PE is [state name of PE]

 

 

 

The Name of the Tender is:
Brief Description of the Works:

Tender Ref:
Lot No(s):

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

 

The PE is Executive Engineer, DPHE, Netrokona.

 

 

 

The Name of the Tender is: Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .
Brief Description of the Works: Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .

Tender Ref: Memo No-2425/EE/DPHE/Netrokona, dt: 03.04.22
Lot No(s):01.

TDS/PDS--B. Tender Document--

Allowed to post clarification till [Date and Time]

Allowed to post clarification till [Date and Time] N/A.

TDS/PDS--C. Qualification Criteria--

10.1a The required average annual construction turnover shall be greater than Tk. 100.00 Lac over the last five years. ( Years counting backward from the date of publication of IFT in the eGP website) ( Tenderer must submit "Completion Certificate" in a format of CPTU Standard Completion Certificate. i.e contain all necessary information , no payment certificate will be counted however TEC might ask for payment certificate against any Completion Certificate. ) A typical standard Work Completion Certificate / Experience Certificate has been attached in Particular Specification section of this tender document.

[ the required average annual construction  turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be  best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)]
Example:
Estimated Contract Value:  Tk 24 lakh
Contract period:   12 months
Estimated Annual Cash Flow:  Tk 24 lakh
Required average annual construction turn over: Tk 12 lakh, using a multiplier of 0.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The required average annual construction turnover shall be greater than Tk. 1,20,00,000.00(One Crore and Twenty Lac) over the last 05(five) years.Years counting backward from the date of publication of IFT in the e-GP website.

TDS/PDS--C. Qualification Criteria--

10.1a The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 30.00 Lac(Please note that in case of Line of Credit Certificate as a Liquid Asset certificate, the certificate must be substantiated by any scheduled Bank of Bangladesh in the format as specified (Form PW3-7, attached in Particular Specifications section of this e Tender documents) ,without alteration, issued not earlier than twenty eight (28) days prior to the day of the original deadline for submission of Tenders.

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 40,00,000.00(Forty Lac).

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

The minimum capacity shall be: Tk. 70,00,000.00(Seventy Lac).
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of at least Tk 80.00 Lac under single contract over a period of last five years shall be required. ( Years counting backward from the date of publication of IFT in the eGP website) ( Experience certificate must be in a format of CPTU Standard Certificate. i.e contain all necessary information ) A typical standard Work Completion Certificate / Experience Certificate has been attached in Particular Specification section of this tender document.

[the minimum value of the similar works under a single or multiple number of  contract(s) is recommended to be between 50  and 75 percent of the estimated cost, rounded off to nearest Taka  thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]

[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package]
 

A satisfactory completion of similar works of at least Tk 60,00,000.00(Sixty Lac) under 01(One) contract over a period of last 05(Five) years shall be required. Years counting backward from the date of publication of IFT in the e-GP website.

TDS/PDS--D. Tender Preparation--

Tenderer shall submit with its Tender, the following additional documents:

Tenderer shall submit with its Tender, the following additional documents:

1) Valid Trade Licence
2) VAT Registration
3)TIN Number
4) Litigation History
5) Work Plan

TDS/PDS--D. Tender Preparation--

The Tender Validity period shall be [state number] days.

[normally 60 to 90 days deemed reasonable]
 

The Tender Validity period shall be 90(Ninety) days.

TDS/PDS--D. Tender Preparation--

The amount of the Tender Security shall be [ state amount ]
[note: Not exceeding three percent (3%) of the official estimated cost but as a fixed amount] 

 

The amount of the Tender Security shall be Tk. 2,65,000.00(Two Lac and Sixty Five Thousand).

TDS/PDS--E. e-Tender Submission--

The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m]
[state date, e.g 15 June,2011  ].
 

The deadline for lodgment of e-Tenders is mentioned in IFT.

Brief Description of Goods,Works or Service

WB-NNGPS-912
Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .

WB-NNGPS-912
Construction of 6 Nos 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at different Upazila of Netrokona District .

Tender/Proposal Security (Amount in BDT)(Lot No : 1) 300000.0 265000
 