1. Payment may require two or more years. No claim of interest for delaying of payment will be entertained. 2. Spoil earth management will followed as per instruction of Engineer in Charge 3. Quantity of tender item may increase or decrease 4. Pre work or Post work will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce. 5. The selected contractor will hand over total site at a time. No scope to handover site partly. 6. Silt will be removed by contractor until the final measurement is taken. Otherwise final post work will be taken above the silt. 7.The contractor will bear the expense to remove of illegal occupancy/structures if remain besides the river 8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor. 9. The design may be changed/ altered. 10. All the liability of contractor personnel will be borne by contractor. 11 . Earthen Dyke Will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land propietorship.as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.
Re-excavation /Dredging of Betna River from km. 32.000 to km. 36.000 = 4000 m in c/w "Drainage Improvement of Polder No. 1, 2, 6-8, 6-8 (Ext.) in Satkhira District" under Satkhira O&M Division-2, BWDB, Satkhira.