| PCC--.--
|
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook.
All four color books contents page will be 80 GSM as specified in in technical specification [section 7]
Within first 40days of the total contract days supplier must deliver 50% of the total deliverable of the contract products and therest 50% of the contract products shall be delivered with in next30 days.
If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG
Both Content Paper (80 GSM/60 GSM) and Art Card (230 GSM) will be supplied by the Supplier
|
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook.
All four color books contents page will be 70 GSM as specified in in technical specification [section 7]
Within first 45days of the total contract days supplier must deliver 50% of the total deliverable of the contract products and therest 50% of the contract products shall be delivered with in next25 days.
If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG
Both Content Paper (70 GSM/60 GSM) and Art Card (230 GSM) will be supplied by the Supplier
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 01 (one) years.
[Years counting backward from the date of publication of IFT in the newspaper.]
For each tender, tenderer must individually have the minimum specific experience as Supplier in supply of similar Goods [Printing, Binding & Supplying of Books] of at least 02 (two) contracts successfully completed participating any tender within the last 05 (five) years, each with a value of at least Tk 21500000
[Years counting backward from the date of publication of IFT in the newspaper.]
For the proof of valid experience certificate tenderer must submit the following documents:
i) Tenderer must provide VAT (if applicable) and Income Tax (IT) certificate with chalan payment certificate for that amount mentioned in experience certificate. Last experience certificate from NCTB must be submitted.
ii) In case of NCTB related Experience Certificate: VAT or Income Tax certificate/chalan submission is not required.
iii) In case of NCTB related Last Specific Experience Certificate submission: NoA Copy is acceptable, NCTB will verify NoA/Experience Certificate whether the contract was successfully completed or not. If not it will not be considered as valid Specific Experience Certificate.
iv) In case of experience of other Govt. /Non. Govt. organization tenderer must submit valid VAT (if applicable) and Income Tax Certificate against the submitted Specific Experience Certificate.
If a tenderer is responsive for more than one tender under this HOPE, then tenderer must comply individual specific experience certificate for each tender. In this case if less specific experience found TEC will consider as non-responsive for insufficient specific experience.
The minimum supply and/or production capacity of Goods is/ are:
1. The Tenderer must have own sufficient machineries for Cover and Text printing, machineries
for perfect/Auto/Glue binding and UV laminating machine to execute the contract. No contractual printing machines will be considered.
2. A Printing Unit shall have a set of printing machineries along with all equipment (binding, UV lamination, cutting, bundling, etc machines) to furnish a set of complete books in the same premises of minimum 1000 sqft. Multiple Printing Units are acceptable considering the mentioned criteria. Minimum one bi-color or higher and one UV machine is allowed for multiple lots or units. Address of all Printing Units must be mentioned in the tender and the printing and binding works must be done in that/those premises. Within the contract period Supplier/Manufacturer must not use this place for any other printing works.
3. Physical facilities of the Tenderer shall be inspected by the TEC or NCTB's inspection Committee. At post evaluation, tenderer must have to show each printing/binding machine running accordingly with a sample printing and binding. Number of tenders to be awarded as per the capacity of the Tenderers.
4. Last performance report of the tenderer will be prepared by NCTB and it will be supplied to TEC. TEC will consider the performance report at the time of tender evaluation. Subject to satisfaction TEC has right to consider as Non-responsive or reduce the production capacity of particular tenderer.
5. The minimum production capacity of printing and Auto binding machine of textbook shall be 100% in quantity of goods of proposed contract within 60 (Sixty) days and it will be verified before final evaluation. Production Capacity of the Machinery is mentioned below. Printing and Binding Capacity Determination:
a. For smooth production (printing, binding and supplying activities) in primary and secondary level textbooks, the production capacity of the machineries of the tenderer shall be aggregately calculated by the concern TEC under the hope of NCTB. At the time of tender evaluation occupied machines (by the concern TEC) shall not be considered for another tender under the hope of NCTB. Unoccupied production capacity will be supplied to TEC by PE under same HOPE for tender evaluation.
b. Production Capacity of Machinery which may be disrupted by power (electricity) outage/shortage. The Production Capacity (including cover and text part) of the Machinery per day:
For modern and latest technology-based web printing machine, capacity will be evaluated if the tenderer submits necessary documents including LC for printing machine, manufacturer catalogue, production capacity, etc.
The production capacity will be prepared after examining the submitted required documents. In case of increased production capacity, tenderer must have equal binding capacity.
If tenderer can’t able to submit required supporting document in favor of web machine production capacity, Web Machine [only 20”x 30” machine size will be considered] will be considered 400 Reams per day and for Sheet Machine Single Color 70 Reams per day, Four Color Sheet Machine 80 Reams per day, and so on. Only for printing covers single or bi-color sheet machines are acceptable.
c. Binding Capacity of Machine depends on clam which may also be disrupted by power (electricity) outage/shortage. The Binding Machine of single clam should have capacity of binding 2500 Books per day. A Tenderer without having adequate capacity for printing and binding will not be considered as qualified.
d. Printing Machine attached with UV lamination machine will not be considered for capacity calculation.
N.B.: Joint Venture (JV) is not allowed. |
The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 01 (one) years.
[Years counting backward from the date of publication of IFT in the newspaper.]
For each tender, tenderer must individually have the minimum specific experience as Supplier in supply of similar Goods [Printing, Binding & Supplying of Books] of at least 02 (two) contracts successfully completed participating any tender within the last 05 (five) years, each with a value of at least Tk 12000000
[Years counting backward from the date of publication of IFT in the newspaper.]
For the proof of valid experience certificate tenderer must submit the following documents:
i) Tenderer must provide VAT (if applicable) and Income Tax (IT) certificate with chalan payment certificate for that amount mentioned in experience certificate. Last experience certificate from NCTB must be submitted.
ii) In case of NCTB related Experience Certificate: VAT or Income Tax certificate/chalan submission is not required.
iii) In case of NCTB related Last Specific Experience Certificate submission: NoA Copy is acceptable, NCTB will verify NoA/Experience Certificate whether the contract was successfully completed or not. If not it will not be considered as valid Specific Experience Certificate.
iv) In case of experience of other Govt. /Non. Govt. organization tenderer must submit valid VAT (if applicable) and Income Tax Certificate against the submitted Specific Experience Certificate.
If a tenderer is responsive for more than one tender under this HOPE, then tenderer must comply individual specific experience certificate for each tender. In this case if less specific experience found TEC will consider as non-responsive for insufficient specific experience.
The minimum supply and/or production capacity of Goods is/ are:
1. The Tenderer must have own sufficient machineries for Cover and Text printing, machineries
for perfect/Auto/Glue binding and UV laminating machine to execute the contract. No contractual printing machines will be considered.
2. A Printing Unit shall have a set of printing machineries along with all equipment (binding, UV lamination, cutting, bundling, etc machines) to furnish a set of complete books in the same premises of minimum 1000 sqft. Multiple Printing Units are acceptable considering the mentioned criteria. Minimum one bi-color or higher and one UV machine is allowed for multiple lots or units. Address of all Printing Units must be mentioned in the tender and the printing and binding works must be done in that/those premises. Within the contract period Supplier/Manufacturer must not use this place for any other printing works.
3. Physical facilities of the Tenderer shall be inspected by the TEC or NCTB's inspection Committee. At post evaluation, tenderer must have to show each printing/binding machine running accordingly with a sample printing and binding. Number of tenders to be awarded as per the capacity of the Tenderers.
4. Last performance report of the tenderer will be prepared by NCTB and it will be supplied to TEC. TEC will consider the performance report at the time of tender evaluation. Subject to satisfaction TEC has right to consider as Non-responsive or reduce the production capacity of particular tenderer.
5. The minimum production capacity of printing and Auto binding machine of textbook shall be 100% in quantity of goods of proposed contract within 60 (Sixty) days and it will be verified before final evaluation. Production Capacity of the Machinery is mentioned below. Printing and Binding Capacity Determination:
a. For smooth production (printing, binding and supplying activities) in primary and secondary level textbooks, the production capacity of the machineries of the tenderer shall be aggregately calculated by the concern TEC under the hope of NCTB. At the time of tender evaluation occupied machines (by the concern TEC) shall not be considered for another tender under the hope of NCTB. Unoccupied production capacity will be supplied to TEC by PE under same HOPE for tender evaluation.
b. Production Capacity of Machinery which may be disrupted by power (electricity) outage/shortage. The Production Capacity (including cover and text part) of the Machinery per day:
For modern and latest technology-based web printing machine, capacity will be evaluated if the tenderer submits necessary documents including LC for printing machine, manufacturer catalogue, production capacity, etc.
The production capacity will be prepared after examining the submitted required documents. In case of increased production capacity, tenderer must have equal binding capacity.
If tenderer can’t able to submit required supporting document in favor of web machine production capacity, Web Machine [only 20”x 30” machine size will be considered] will be considered 400 Reams per day and for Sheet Machine Single Color 70 Reams per day, Four Color Sheet Machine 80 Reams per day, and so on. Only for printing covers single or bi-color sheet machines are acceptable.
c. Binding Capacity of Machine depends on clam which may also be disrupted by power (electricity) outage/shortage. The Binding Machine of single clam should have capacity of binding 2500 Books per day. A Tenderer without having adequate capacity for printing and binding will not be considered as qualified.
d. Printing Machine attached with UV lamination machine will not be considered for capacity calculation.
N.B.: Joint Venture (JV) is not allowed.
|
| Brief Description of Goods,Works or Service
|
For Printing (with paper), Binding and Supplying of textbooks of Ebtadie 3-5 , Secondary, Dakhil 8-9 and SSC/Dakhil Vocational level books to be distributed for the Academic Year 2023
|
For Printing (with paper), Binding and Supplying of textbooks of Ebtadie 3-5 , Secondary, Dakhil 8-9 and SSC/Dakhil Vocational level books to be distributed for the Academic Year 2023
|