View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Correction is needed in TDS |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TDS/PDS--B. e-Tender Document (e-TD)-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till: not allowed |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | Pre- Tender meeting [Date & Time] |
Pre-Tender meeting: As stated as tender notice. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- |
A Pre-Tender meeting shall not be held
[delete whichever is not applicable] |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [state number] years. [a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (five) years. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, each with a value of at least Tk 700.00 lakh (Taka Seven hundred Lakh) lakh only. Similar Works mean River Bank Protective Work, Spur, Groyne, Clouser, Slope Protection, Guide wall |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 900.00 Lakh (Taka Nine hundred lakh) only over the last 5(five) years. [Years counting backward from the date of publication of IFT in the newspaper] The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 400 lakh (Taka Four hundred Lakh) lakh only. Strictly, Credit Commitment (s) substantiated by any scheduled Bank of Bangladesh in the format as specified (Form PW3-7), without alteration, issued not earlier than 28 (Twenty Eight) days prior to the day of the original deadline for submission of this Tender, will be accepted. The Credit line format is uploaded in section-8 . |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum Tender Capacity shall be: Tk 875.00 lakh (Taka Eight Hundred Seventy Five lakh) only |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
[ qualification of an alternative Construction Project Manager may also be requested] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
[ qualification of an alternative Construction Project Manager may also be requested] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [state amount] |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : As per ITT-19.1 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works:
|
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents:
|
The Tenderer shall submit with its Tender the following additional documents: The Work Plan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract.
Iif prices shall be adjustable, the methodology for adjustment should be specified] |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is [state time, and identify a.m or p.m, i.e 10.30 a.m]
|
The deadline for lodgement of e-Tenders is as per tender notice |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstance corrigendum needed in TDS. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 12/06/2022 17:00 | 19/06/2022 12:00 |
| Eligibility of Consultant | 1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet and PPR-2008. 6.Tenderer must need to be submitted line of credit certificate in PW3-7 prescribed format which is attached n the general section of this tender. 7. Work certificate which is issued by the PE (Procuring Entity) only is considered for turnover calculation. Other work certificates are not being considered. 8. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not being considered 9. Contractor must need to take still pictures and video before starting the work and after completion of work byhis/ her own cost. These still pictures and videos need to enclose with the bill of work. |
1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet and PPR-2008. 6.Tenderer must need to be submitted line of credit certificate in PW3-7 prescribed format which is attached n the general section of this tender. 7. Work certificate which is issued by the PE (Procuring Entity) only is considered for turnover calculation. Other work certificates are not being considered. 8. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not being considered 9. Contractor must need to take still pictures and video before starting the work and after completion of work byhis/ her own cost. These still pictures and videos need to enclose with the bill of work. |
| Opening Date & Time | 13/06/2022 12:30 | 19/06/2022 12:30 |
| Meeting Start Date & Time | 30/05/2022 10:00 | 01/06/2022 10:00 |
| Last date & time for Tender/Proposal Security Submission | 13/06/2022 12:00 | 19/06/2022 12:00 |
| Closing Date & Time | 13/06/2022 12:30 | 19/06/2022 12:30 |
| Brief Description of Goods,Works or Service | RIVERBANK PROTECTIVE WORK ALONG THE RIGHT BANK OF DUDHKUMAR RIVER FROM KM 0.000 TO KM 0.500=500.00 M AND U/S END TERMINATION AT ISLAMPUR AREA IN UPAZILA- BHURUNGAMARI, DIST- KURIGRAM |
RIVERBANK PROTECTIVE WORK ALONG THE RIGHT BANK OF DUDHKUMAR RIVER FROM KM 0.000 TO KM 0.500=500.00 M AND U/S END TERMINATION AT ISLAMPUR AREA IN UPAZILA- BHURUNGAMARI, DIST- KURIGRAM |