1. All registered tenderer in E-GP system. 2. A satisfactory completion of similar works of at least Tk 4.50 lakh under 01 contract ( Supply of Mobile Materials under LGED) over a period of last five years shall be required (not before FY:2011-12 ). 3. The required average annual construction turnover shall be greater than Tk 4.00 lakh last five years (not before FY:2011-12 ). 4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 2.00 lakh only. 5. In case of multiple number of contractual commitments, a written testimony by the tenderer that demonstrates that the tenderer have resources sufficient to meet the aggregate of the qualifying criteria for the individual contracts/ contractual commitments ( A Sample Format attached and upload in Particular Specifications).
6. Work volume ( i.e. Materials supply) may be increase / decrease as per practical requirement
e-Tender/LGED/Gopa/GOBM/16-17/W-02 Supplying of Materials for MMT in LGED, Gopalganj.