1) All tenderer must be registered in e-gp portal system. 2) Payment will be made upon availability of fund; no claim will be entertained. 3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and theevaluation team is unable to open the file, no claim will be considered. 4) VAT & IT from bill will be deducted as per prevailing Government Rate. 5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will dothis at his own expense.No extra claims will be considered. 6) The tenderer must follow the latest instructions and formats of CPTU. 7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his ownexpense and planning. 8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor'sown cost. 9) Quantity of work may extremely change and Design may also be modified. 10) Cost of pre work, interim and post-work survey will be borne by the contractor. 11) The work must be executed as per approved design uploaded at Sec-9 & technical specifications of BWDB uploaded at Sec-7of tender document. 12) The approved taskforce guideline uploaded at Sec-8 will be followed. 13) In addition to BWDB, the consultant of DRMEP project will monitor and check the quality and quantity of executed work. 14) Tenderer/Firm must sign and submit duly filled-in ‘JICA’s Acknowledgement of Compliance (Form ACK) and must state itsfinancial situation in accordance with the Form FIN-1 of JICA’s Bidding Document uploaded as Appendix-1 and Appendix-2 at Sec-7 of tender document as per ITT 4.4 and ITT 5.5 respectively.
Construction of Protective work /slope protection work along the bank of the river Maloncho/Kholpetua/Kalindi at various points of Shyamnagar upazila in Polder No. 5 from km 102.120 to km 102.820 = 700m, km 105.514 to km 105.680=166m (slope protection work), in between km 107.000 to km 107.120 and km 107.270- km 107.780=630m, km 111.640 to km 112.140 =500m, km 126.100 to km 126.600= 500m in connection with Disaster Risk Management Enhancement Project (Component-1, BWDB Part) under Satkhira O&M Division-1, BWDB, Satkhira during the year 2021-24.