Eligibility and conditions of the tenderer are shown in TDS of tender documents.
On main line in CTG- KBDM Section :- Construction of ballast protection wall at km. 3/1-6 (Left side) =990'-0", Km 3/1-4 (Right side) =200'-0", Km 4/6-7 (Left side) =200'-0",Km 5 /8-9 (Left side) =200'-0" , KM 5/2-3 (Right side) =150'-0", KM 5/6-9 (Right side) =260'-0", Total= 2000'-0" in between station CTG - KBDM including repairs to cess & bank and other allied works as per drawing.