As specified in the TDS.
Special Instruction:
* All tenderer must go through Section-7 (General Specifications) where Annexure-i & ii are uploaded. These additional documents have been added to match with ADB Guideline. Following it as a part of tender document is mandatory.
Underwater riverbank protection with geotextile bags at Upstream Chauhali - 7.50 km