View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS Modification |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As Per TDS |
As Per TDS |
| Opening Date & Time | 24/08/2022 11:00 | 29/08/2022 11:00 |
| Closing Date & Time | 24/08/2022 11:00 | 29/08/2022 11:00 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover (AACT) shall be greater than Tk 21000000/- ( Two Crore Ten Lacs taka only) over the last 05 years. Years Counting backward from the date of advertisement in e-GP website. Turnover Certificate shall be construction Turnover. Duplication will not be allowed. |
The rquired average annual construction turnover (AACT) shall be greater than Tk 21000000.00/- (Taka Two Crore Ten Lakh Only) over the last 05 years. and Years Counting backward from the date of advertisement in e-GP Website. Turn over certificate must be at per payment certificate. Duplication will not be allowed. Turn over must be construction turn over. In Case of any tenderer is qualified for more than one package,Turn Over must be Cumulative.Otherwise the tenderer will be considered as Non-responsive at Evaluation Stage. |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 7000000/- ( Taka Seventy Lacs only). Certificate submitted before 24-08-2022 shall not be taken into account. In case of Line of credit, it must be submitted at per CPTU standard Formate. In case of credit facilities, it must be sanctioned and sufficient amount must be unspent. In case of Liquid asset, Certificate with bank statement must be submitted. |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 7000000/- ( Taka Seventy Lacs only). Certificate submitted before 02-08-2022 shall not be taken into account. In case of Line of credit, it must be submitted at per CPTU standard Formate. In case of credit facilities, it must be sanctioned and sufficient amount must be unspent. In case of Liquid asset, Certificate with bank statement must be submitted. |
| TDS/PDS--E. e-Tender Submission-- | The deadline for lodgment of e-Tenders is at 11:00 A.M of 24-08-2022. |
The deadline for lodgment of e-Tenders is at 11:00 A.M of 29-08-2022. |
| Brief Description of Goods,Works or Service | Installation of 100x38mm dia Deep Tubewell with 0.75 HP Capacity Submersible Pump with Structure at Juri and Borolekha Upazila of Moulvibazar district under Project for Improvement of sustainable Water Supply, Sanitation and Hygiene System in Haor areas (2022-23). |
Installation of 100x38mm dia Deep Tubewell with 0.75 HP Capacity Submersible Pump with Structure at Juri and Borolekha Upazila of Moulvibazar district under Project for Improvement of sustainable Water Supply, Sanitation and Hygiene System in Haor areas (2022-23). |