1. A satisfactory completion of similar work (Gas distribution pipeline construction/maintenance and its associated works) of at least Tk 2600000 (Twenty six Lac) under single (01) contract over a period of last 5 (five) years shall be required. 2. The required average annual construction turnover shall be greater than Tk 18 Lac over the best three (3) years in the last five (5) years. 3. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk Lac issued by the Bank not earlier than 28 days prior the day of the original deadline for submission of e-Tender.
Rehabilitation, Repair & Maintenance Works of existing Gas Pipeline (up to 150 psig) Network, Valve Pit etc. for one (01) year under SGCL Franchise Area.