Tenderer shall submit with its Tender, the following additional documents:
1. A Programme & Work Schedule must be submitted for this Works within 07 days through Engineer-Incharge to PE after signing of the Contract.
2. As per work schedule, after execution of work, Measurement Certificate should be prepared by Engineer-Incharge & Contractor.
3. Before submitting the tender the tenderer is to be aware to submit a Consent Letter so that he is aware of this. Failure to submit the consent letter will disqualify the tenderer.
4. Valid Trade License, Income Tax Certificate, VAT,
Repairing and Maintenance of 132kV Haripur-Sonargaon Line and 230kV Haripur-Hasnabad Line Tower Leg Angles and Member under GMD Dhaka East,PGCB Ltd.