View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | IFT |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 02/10/2022 16:00 | 09/10/2022 15:00 |
| Opening Date & Time | 03/10/2022 11:00 | 10/10/2022 11:00 |
| PCC--A. General-- |
|
|
| Meeting End Date & Time | 29/09/2022 16:00 | 06/10/2022 15:00 |
| Last date & time for Tender/Proposal Security Submission | 02/10/2022 16:00 | 09/10/2022 15:00 |
| Closing Date & Time | 03/10/2022 11:00 | 10/10/2022 11:00 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | TDS, PCC |
| Field Name | Old Value | New Value |
|---|---|---|
| PCC--B. Time Control-- | The Intended Completion Date for the whole of the Works is 365 days |
The Intended Completion Date for the whole of the Works is as per workorder. |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 50.00 Lac (But not before than IFT published in the egp-web portal) |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 50.00 Lac (But not before than IFT published in the egp-web portal). The liquid asset certificate/Credit Facilities should be submitted in standard format (Form PW2a-3). otherwise will be treated as non responsive. |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 110.00 lac over the last 05 years. years counting backward from the date of publication of IFT in the egp-web portal. |
The required average annual construction turnover shall be greater than Tk 130.00 lac over the last 05 years. years counting backward from the date of publication of IFT in the egp-web portal. |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk 120.00 lac under 01 number of contract over a period of 05 years shall be required. years counting backward from the date of publication of IFT in the egp-web portal |
A satisfactory completion of similar works (Tubewell/Pipe diameter and technology of the deep tubewell should be same as per BOQ) of at least Tk 120.00 lac under 01 number of contract over a period of 05 years shall be required. years counting backward from the date of publication of IFT in the egp-web portal |
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents:
1.Trade license (updated). 7. work plan |
Tenderer shall submit with its Tender, the following additional documents:
1.Trade license (updated). 6. work plan 7. For Turnover Calculation payment certificate will be considered only. experience certificate or others certificate will not considered for turnover calculation. 8. All information regarding running work should be submitted properly. if anyone hide any running work information and that is found during tender evaluation the tender will be non responsive. This will be treated as fraudulant practice of the bidder.Tender capacity information should be submitted in PW2A-2B format. 9. The bidder should submit manpower list and equipment list related to this work. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | BoQ |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | as per TDS |
as per TDS |
| Brief Description of Goods,Works or Service | Installation of Deep Tubewell in Chandpur district under Project for Safe Water Supply Throughout the Country during the FY: 2022-2023. |
Installation of Deep Tubewell in Chandpur district under Project for Safe Water Supply Throughout the Country during the FY: 2022-2023. |