As per -ITT
IRIDP-2/HOB/DW-57 a) Improvement of Dewpara Satak Road -Aushkandi Bahubal Road via Gabdeb Road (Ch. 480-980 m). b) Construction of 1 no 0.625mx0.60m Slab Culvert at ch:- 340m on the same road. under upazila:Nabigonj,District: Habiganj(Road ID-636774019) ( Salvage cost Tk.94,985/-)