Any tenderer(s) who fulfill the requirements stated in TDS. The Tenderer with a poor performance, consistent history of litigation or arbitration awards against it shall not be eligible to tender. * During evaluation if the quoted rate by any tenderer is found more than 5(Five) percent less/above than the Official Estimated price, then it is mandatory to submit Rate Analysis when asked by the Procuring Entity according to Memo No- 35.00.0000.015.14.049.16-516 Dated-31.07.2018 of Maintenance Wing, Road Transport & Highways Division, Ministry of Road Transport & Bridges
N:B:
* 60/70 Grade Bitumen shall be used in all DBS Wearing Course and DBS Base Course works in this project. * For preparation of DBS materials Asphalt Batching Plant must be used by the contractor. * The tenderers shall have their own Asphalt Batching Plant. If the tenderers do not have their own Asphalt Batching Plant they may hire it from any other source; But then the tenderers have to submit the contractual agreement to hire or lease of the Asphalt Batching Plant in non-judicial stamp of Tk. 300 affidavit by the notary public. * The Additional Chief Engineer, RHD, Chattogram Zone will visit the plant during evaluation process to verify the location and condition of the plant. * The Defects Liability Period is 1095 Days
Construction of Rigid Pavement at Ch: 24+380 to 24+680 =300m (Munshighata) and at Ch:28+300 to 28+500 =200m (Pink City), RCC Sub merged Box Culvert Construction work at Rabar Bagan (Giri Chaya) (Chainage 29+800 to 30+000=200m) of Chattogram-Rangamati National Highway (N-106) (Hathazari-Raozan portion) 4 Laning Project under Chattogram Road Division during the year 2022-2023 (WP-02Ka).